Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13352
Well Classification: GW Status: PR - 12/28/2005
Well Name/No:PUCKETT #24B-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/28/2005
FacilityID:274466LocationID:324395
County:GARFIELD #045Location:SESW 1 7S97W 6
Field:GRAND VALLEY - #31290Elevation:8228 ft.
Basin:PICEANCE BASIN  
Planned Location:819FSL  1990 FWLLat/Long: 39.469538 / -108.170748Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.469580 / -108.170940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/28/2005             Measured TD: 8699 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/28/2005
Wellbore Permit
Permit #:20042402 Expiration Date:10/28/2005
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-1 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/19/2005
Spud Date:6/26/2005Spud Date Is:ACTUAL
Measured TD:8699 ft.Measured PB depth:8526 ft.
True Vertical TD:True Vertical PB depth:
Log Types:PULSE NEUTRON, CBL,TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2894 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 2894 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8526 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6250 ft., Bottom: 8526 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 6250 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 5520 ft., Bottom: 6250 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G4152 ft.NN
FORT UNION4478 ft.NN
OHIO CREEK5697 ft.
WILLIAMS FORK5918 ft.NN
CAMEO8002 ft.NN
ROLLINS8461 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/28/2005                Interval Top: 7094 ft.    Interval Bottom: 8298 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/18/2006Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/14/2005
Treatment Summary:BJ SERVICES FRACED USING 3,303 BBL 20# VISTAR GEL; 279,327# 20/40 FRAC SAND; AND 76,231# SUPER LC 20/40 RESIN COATED SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7950 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 2
BTU_GAS 1080
CALC_BBLS_H2O 3
CALC_BBLS_OIL 2
CALC_GOR 73000
CALC_MCF_GAS 146
CASING_PRESS 1250
MCF_GAS 146
TUBING_PRESS 1100
Perforation Data:
Interval Top:7094 ft.# Of Holes:46
Interval Bottom:8298 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10211
GOR
GOR DeterminationMCFE
Average BOE per Day4.822
Average MCFE per Day27.946

 Federal Financial Assurance  i 

 Tribal Well  i No