|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2026 Measured TD: 9254 ft. Vertical TD: 9222 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2026 | | Wellbore Permit | | | Permit #: | 20042350 | Expiration Date: | 10/25/2005 | | Proposed Depth/Form: | 9600 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 100 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/16/2005 | | Spud Date: | 9/25/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 9254 ft. | Measured PB depth: | 9182 ft. | | True Vertical TD: | 9222 ft. | True Vertical PB depth: | 9149 ft. | | Log Types: | COMPENSATED NEUTRON DENSITY, INDUCTION, CBL, GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1605 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 860, Top: 0 ft., Bottom: 1605 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9254 ft., Weight: 12 , Citings Type: ACTUAL | | Cement: | Sacks: 1365, Top: 6220 ft., Bottom: 9254 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 6123 ft. | | N | N | | ROLLINS | 9116 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: SI - 1/1/2026 Interval Top: 7284 ft. Interval Bottom: 8962 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/16/2005 | Choke Size: | 0.281 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2005 | | Treatment Summary: | DS SLICKWATER FRAC: 16,511 BBL WATER, 626,000# 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8399 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/3/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | BBLS_OIL | 0 | | BTU_GAS | 1040 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1300 | | CASING_PRESS | 1200 | | MCF_GAS | 1300 | | TUBING_PRESS | 940 |
| | Perforation Data: | | Interval Top: | 7284 ft. | # Of Holes: | 164 | | Interval Bottom: | 8962 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6426 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 2.997 |
| Average MCFE per Day | 17.396 |
| Federal Financial Assurance | i | |
|
|