Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13331
Well Classification: GW Status: PR - 7/6/2005
Well Name/No:CLOUGH #RWF 424-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/6/2005
FacilityID:274138LocationID:335218
County:GARFIELD #045Location:SESW 22 6S94W 6
Field:RULISON - #75400Elevation:5225 ft.
Basin:PICEANCE BASIN  
Planned Location:1103FSL  1524 FWLLat/Long: 39.506409 / -107.878440Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.506534 / -107.878550Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/6/2005             Measured TD: 7538 ft.    Vertical TD: 7489 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/6/2005
Wellbore PermitDIRECTIONAL
Permit #:20042226 Expiration Date:10/13/2005
Proposed Top PZ Location:Sec: Twp: Footage: 629 FSL  1988 FWL
Bottom Hole Location:Sec: Twp: Footage: 629 FSL  1988 FWL
Proposed Depth/Form:7767 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:4/10/2005
Spud Date:2/2/2005Spud Date Is:ACTUAL
Measured TD:7538 ft.Measured PB depth:7264 ft.
True Vertical TD:7489 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 629 FSL  1988 FWL
Bottom Hole Location:Sec: Twp: Footage: 629 FSL  1988 FWL
Log Types:RESERVOIR MONITOR TOOL ELITE, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1127 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7487 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1025, Top: 3600 ft., Bottom: 7487 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G1470 ft.NN
MESAVERDE3985 ft.NN
CAMEO6800 ft.NN
ROLLINS7720 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/6/2005                  Interval Top: 5344 ft.    Interval Bottom: 7155 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/10/2005
Treatment Summary:4000 GALS 7 1/2% HCL,551000# 20/40, 12988 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6581 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/16/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1088
CASING_PRESS 1052
MCF_GAS 1088
TUBING_PRESS 944
Perforation Data:
Interval Top:5344 ft.# Of Holes:80
Interval Bottom:7155 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)9214
GOR418818
GOR DeterminationMCFE
Average BOE per Day4.411
Average MCFE per Day25.619

 Federal Financial Assurance  i 

 Tribal Well  i No