|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2026 Measured TD: 10480 ft. Vertical TD: 10430 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20075824 | Expiration Date: | 12/3/2008 | | Proposed Top PZ Location: | Sec:10 Twp: 6S 96W | Footage: 972 FNL 1430 FWL | | Bottom Hole Location: | Sec:10 Twp: 6S 96W | Footage: 1002 FNL 1314 FWL | | Proposed Depth/Form: | 10646 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/14/2008 | | Spud Date: | 9/4/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 10480 ft. | Measured PB depth: | 10040 ft. | | True Vertical TD: | 10430 ft. | True Vertical PB depth: | 9991 ft. | | Top PZ Location: | Sec:10 Twp: 6S 96W | Footage: 972 FNL 1430 FWL | | Bottom Hole Location: | Sec:10 Twp: 6S 96W | Footage: 1002 FNL 1314 FWL | | Log Types: | RST PACKAGE, CBL | | Log Types: | CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 142 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 3, Top: 22 ft., Bottom: 142 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 3025 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 1305, Top: 142 ft., Bottom: 3050 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10245 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 3050 ft., Bottom: 10540 ft., Determination Method: | | Casing: | String Type: 2ND, Hole Size: , Size: , Top: , Depth: 9966 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 8760 ft., Bottom: 10140 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: , Depth: 8611 ft., Bottom: , Sacks: 475, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 8265 ft., Bottom: , Sacks: 775, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 5427 ft., Depth: 5460 ft., Bottom: 5460 ft., Sacks: 1300, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 7925 ft., Bottom: , Sacks: 200, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OHIO CREEK | 7256 ft. | | N | N | | WILLIAMS FORK | 7475 ft. | 10045 ft. | | | | CAMEO | 10041 ft. | | N | N | | ROLLINS | 10350 ft. | | N | N |
Formation WMFK Formation Classification: OW Status: SI - 1/1/2026 Interval Top: 8265 ft. Interval Bottom: 9972 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 8/27/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/8/2012 | Treatment End Date: | 10/9/2012 | | Treatment Summary: | Stage 1: 9653-9972' @ 2 SPF (22 shots): Frac'd with 52560#'s of 30/50 white sand and 9473 bbls of fluid
Stage 2: 9323-9567' @ 2 SPF (41 shots): Frac'd with 60000#'s of 30/50 white sand and 8830.5 bbls of fluid
Stage 3: 8997-9260' @ 2 SPF (44 shots): Frac'd with 77060#'s of 30/50 white sand and 11301.7 bbls of fluid w/ 500 gals 7.5% acid
Stage 4A: 8791-8960' @ 2 SPF (20 shots): Frac'd with 56000#'s of 30/50 white sand and 3614.9 bbls of fluid w/ 500 gals 7.5% acid
Stage 4B: 8611-8720' @ 2 SPF (26 shots): Frac'd with 97800#'s of 30/50 white sand and 7050.7 bbls of fluid w/ 500 gals 7.5% acid
Stage 5A: 8419-8514' @ 2 SPF (21 shots): Frac'd with 38000#'s of 30/50 white sand and 2533.9 bbls of fluid w/ 500 gals 7.5% acid
Stage 5B: 8265-8362' @ 2 SPF (30 shots): Frac'd with 76940#'s of 30/50 white sand and 5669 bbls of fluid
| | Total fluid used in treatment (bbls): | 48520 | Max pressure during treatment (psi): | 8801 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.50 | | Recycled water used in treatment (bbls): | 48472 | Total flowback volume recovered (bbls): | 27500 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 458360 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9504 ft. | | Tubing Packer Depth: | 8456 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/6/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 440 | | BTU_GAS | 1060 | | CALC_BBLS_H2O | 440 | | CALC_MCF_GAS | 1162 | | CASING_PRESS | 1773 | | MCF_GAS | 1162 | | TUBING_PRESS | 873 |
| | Perforation Data: | | Interval Top: | 8265 ft. | # Of Holes: | 204 | | Interval Bottom: | 9972 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 42 |
| Total Gas Produced (MCF) | 16834 |
| GOR | 400809 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.036 |
| Average MCFE per Day | 46.612 |
| Federal Financial Assurance | i | |
|
|