|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/17/2010 Measured TD: 10617 ft. Vertical TD: 10555 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/17/2010 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20075829 | Expiration Date: | 12/3/2008 | | Proposed Top PZ Location: | Sec:10 Twp: 6S 96W | Footage: 103 FNL 897 FWL | | Bottom Hole Location: | Sec:10 Twp: 6S 96W | Footage: 103 FNL 897 FWL | | Proposed Depth/Form: | 10586 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/11/2008 | | Spud Date: | 7/23/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 10617 ft. | Measured PB depth: | 10524 ft. | | True Vertical TD: | 10555 ft. | True Vertical PB depth: | 10462 ft. | | Top PZ Location: | Sec:10 Twp: 6S 96W | Footage: 103 FNL 897 FWL | | Bottom Hole Location: | Sec:10 Twp: 6S 96W | Footage: 103 FNL 897 FWL | | Log Types: | CBL, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 132 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 132 ft., Determination Method: | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2993 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1305, Top: 0 ft., Bottom: 2993 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10570 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 3970 ft., Bottom: 10570 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OHIO CREEK | 7343 ft. | | N | N | | WILLIAMS FORK | 7512 ft. | | N | N | | CAMEO | 10091 ft. | | N | N | | ROLLINS | 10384 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 10/28/2008 Interval Top: 9193 ft. Interval Bottom: 10185 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/28/2008 | Choke Size: | 0.375 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/22/2008 | | Treatment Summary: | WELL FRAC'D IN 3 STAGES USING 7,749 BBLS SLICKWATER AND 282,191# OF 30/50 WHITE SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1070 | | CALC_MCF_GAS | 883 | | CASING_PRESS | 575 | | MCF_GAS | 883 |
| | Perforation Data: | | Interval Top: | 9193 ft. | # Of Holes: | 72 | | Interval Bottom: | 10185 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 6/17/2010 Interval Top: 8234 ft. Interval Bottom: 9147 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 22.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/19/2010 | | Treatment Summary: | Well was frac'd in 5 stages (stages 4-8) using 37,662 bbls slickwater fluid mixed with 2500 gals 7.5% acid and 720,377 lbs 30/50 white sand.
Stage 4 - 8,995' - 9,147' @ 2 spf (30 shots). Frac'd with 107,999 lbs 30/50 white sand and 5,738 bbls slickwater fluid. Led with 500 gals 7.5% acid.
Stage 5 - 8,838 - 8,932' @ 2 spf (30 shots). Frac'd with 93,096 lbs 30/50 white sand and 5,000 bbls slickwater fluid. Led with 500 gals 7.5% acid.
Stage 6 - 8,654' - 8,786' @ 2 spf (30 shots). Frac'd with 204,103 lbs 30/50 white sand and 10,546 bbls slickwater fluid. Led with 500 gals 7.5% acid.
Stage 7 - 8,510' - 8604' @ 2 spf (30 shots). Frac'd with 153,080 lbs 30/50 white sand and 7,964 bbls slickwater fluid. Led with 500 gals 7.5% acid.
Stage 8 - 8,234 - 8,428' @ 2 spf (30 shots. Frac'd with 162,099 lbs 30/50 white sand and 8,414 bbls slickwater fluid. Led with 500 gals 7.5% acid. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9582 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/17/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 498 | | BTU_GAS | 1109 | | CASING_PRESS | 1890 | | MCF_GAS | 240 | | TUBING_PRESS | 940 |
| | Perforation Data: | | Interval Top: | 8234 ft. | # Of Holes: | 150 | | Interval Bottom: | 9147 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 46 |
| Total Gas Produced (MCF) | 12640 |
| GOR | 274782 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.100 |
| Average MCFE per Day | 35.353 |
| Federal Financial Assurance | i | |
|
|