Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13182
Well Classification: GW Status: PR - 12/8/2006
Well Name/No:CLOUGH #RWF 412-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C34549
Facility Status:PRStatus Date12/8/2006
FacilityID:288285LocationID:335076
County:GARFIELD #045Location:SENW 29 6S94W 6
Field:RULISON - #75400Elevation:5204 ft.
Basin:PICEANCE BASIN  
Planned Location:2277FNL  1534 FWLLat/Long: 39.497110 / -107.915880Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.497114 / -107.915880Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/12/2006             Measured TD: 7770 ft.    Vertical TD: 7658 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/12/2006
Wellbore PermitDIRECTIONAL
Permit #:20065328 Expiration Date:12/7/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2158 FNL  536 FWL
Bottom Hole Location:Sec:29 Twp: 6S 94W Footage: 2158 FNL  535 FWL
Proposed Depth/Form:7773 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:5/15/2007
Spud Date:4/28/2007Spud Date Is:ACTUAL
Measured TD:7770 ft.Measured PB depth:7632 ft.
True Vertical TD:7658 ft.True Vertical PB depth:
Top PZ Location:Sec:29 Twp: 6S 94WFootage: 2153 FNL  545 FWL
Bottom Hole Location:Sec:29 Twp: 6S 94WFootage: 2153 FNL  545 FWL
Log Types:CBL; HIGH RESOLUTION IND, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1954 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 1954 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7756 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1225, Top: 3368 ft., Bottom: 7756 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1764 ft.NN
WILLIAMS FORK4165 ft.NN
CAMEO6765 ft.NN
ROLLINS7725 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/13/2007                 Interval Top: 5426 ft.    Interval Bottom: 7486 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/28/2007Choke Size:0.156 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/2007
Treatment Summary:3,750 GALS 7 1/2% HCL; 706,700# 20/40 SAND; 20,275 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:6858 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/13/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 2440
MCF_GAS 1363
TUBING_PRESS 2320
Perforation Data:
Interval Top:5426 ft.# Of Holes:143
Interval Bottom:7486 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)21677
GOR802851
GOR DeterminationMCFE
Average BOE per Day10.317
Average MCFE per Day59.836

 Federal Financial Assurance  i Y

 Tribal Well  i No