Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13168
Well Classification: GW Status: PR - 12/5/2006
Well Name/No:DIAMOND ELK #PA 514-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/5/2006
FacilityID:288192LocationID:323993
County:GARFIELD #045Location:SWSW 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5264 ft.
Basin:PICEANCE BASIN  
Planned Location:803FSL  481 FWLLat/Long: 39.475730 / -107.954320Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475739 / -107.954329Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/9/2006             Measured TD: 7560 ft.    Vertical TD: 7527 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/9/2006
Wellbore PermitDIRECTIONAL
Permit #:20065233 Expiration Date:12/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 241 FSL  545 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 241 FSL  545 FWL
Proposed Depth/Form:7566 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-28 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:2/25/2007
Spud Date:2/11/2007Spud Date Is:ACTUAL
Measured TD:7560 ft.Measured PB depth:7500 ft.
True Vertical TD:7527 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 245 FSL  558 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 245 FSL  558 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1103 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1103 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7550 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1004, Top: 2670 ft., Bottom: 7550 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1714 ft.NN
MESAVERDE3986 ft.NN
CAMEO6716 ft.NN
ROLLINS7422 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/9/2007                  Interval Top: 5313 ft.    Interval Bottom: 7356 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/31/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/30/2007
Treatment Summary:4000 GALS 7 1/2% HCL; 838,700# 30/50 SAND; 20,035 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6807 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1735
MCF_GAS 1195
TUBING_PRESS 1528
Perforation Data:
Interval Top:5313 ft.# Of Holes:166
Interval Bottom:7356 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)16786
GOR729826
GOR DeterminationMCFE
Average BOE per Day7.992
Average MCFE per Day46.384

 Federal Financial Assurance  i 

 Tribal Well  i No