Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13147
Well Classification: GW Status: PR - 7/25/2007
Well Name/No:PUCKETT #GM 33-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date7/25/2007
FacilityID:288047LocationID:335184
County:GARFIELD #045Location:NESE 29 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5468 ft.
Basin:PICEANCE BASIN  
Planned Location:1903FSL  1156 FELLat/Long: 39.492994 / -108.127130Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.492995 / -108.127126Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/25/2007             Measured TD: 6867 ft.    Vertical TD: 6694 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/25/2007
Wellbore PermitDIRECTIONAL
Permit #:20074342 Expiration Date:9/19/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2486 FSL  2161 FEL
Bottom Hole Location:Sec:29 Twp: 6S 96W Footage: 2462 FSL  2216 FEL
Proposed Depth/Form:6810 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:1/5/2008
Spud Date:12/26/2007Spud Date Is:ACTUAL
Measured TD:6867 ft.Measured PB depth:6811 ft.
True Vertical TD:6694 ft.True Vertical PB depth:6638 ft.
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 2451 FSL  2200 FEL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 2451 FSL  2200 FEL
Log Types:CBL; RMTE; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2120 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 451, Top: 0 ft., Bottom: 2120 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6843 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 847, Top: 1480 ft., Bottom: 6843 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1905 ft.NN
MESAVERDE3660 ft.NN
CAMEO6193 ft.NN
ROLLINS6673 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/31/2008                 Interval Top: 4853 ft.    Interval Bottom: 6704 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/17/2008Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/13/2008
Treatment Summary:3534 GALS 7.5% HCL; 1,133,500# 30/50 SAND; 32143 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6141 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1038
CASING_PRESS 1811
MCF_GAS 1476
TUBING_PRESS 1681
Perforation Data:
Interval Top:4853 ft.# Of Holes:141
Interval Bottom:6704 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)23849
GOR794966
GOR DeterminationMCFE
Average BOE per Day11.360
Average MCFE per Day65.888

 Federal Financial Assurance  i Y

 Tribal Well  i No