Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13146
Well Classification: GW Status: PR - 7/31/2008
Well Name/No:PUCKETT #GM 634-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date7/31/2008
FacilityID:288048LocationID:335184
County:GARFIELD #045Location:NESE 29 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5468 ft.
Basin:PICEANCE BASIN  
Planned Location:1834FSL  1124 FELLat/Long: 39.492806 / -108.127015Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.492807 / -108.127012Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2008             Measured TD: 6905 ft.    Vertical TD: 6523 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2008
Wellbore PermitDIRECTIONAL
Permit #:20074338 Expiration Date:9/19/2008
Proposed Top PZ Location:Sec: Twp: Footage: 215 FSL  1900 FEL
Bottom Hole Location:Sec:29 Twp: 6S 96W Footage: 196 FSL  1837 FEL
Proposed Depth/Form:6935 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:3/17/2008
Spud Date:3/11/2008Spud Date Is:ACTUAL
Measured TD:6905 ft.Measured PB depth:6862 ft.
True Vertical TD:6523 ft.True Vertical PB depth:6480 ft.
Top PZ Location:Sec:29 Twp: 6S 96WFootage: 194 FSL  1814 FEL
Bottom Hole Location:Sec:29 Twp: 6S 96WFootage: 194 FSL  1814 FEL
Log Types:CBL; RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2180 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 482, Top: 0 ft., Bottom: 2180 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6895 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 772, Top: 2170 ft., Bottom: 6895 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1954 ft.NN
MESAVERDE3797 ft.NN
CAMEO6320 ft.NN
ROLLINS6781 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2008                 Interval Top: 4983 ft.    Interval Bottom: 6690 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/20/2008Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/17/2008
Treatment Summary:500 GAL 7.5% HCL; 1,060,100# 30/50 SAND; 32,497 BLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6228 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1408
CASING_PRESS 606
MCF_GAS 1408
TUBING_PRESS 283
Perforation Data:
Interval Top:4983 ft.# Of Holes:117
Interval Bottom:6690 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9630
GOR802500
GOR DeterminationMCFE
Average BOE per Day4.578
Average MCFE per Day26.581

 Federal Financial Assurance  i Y

 Tribal Well  i No