Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13137
Well Classification: GW Status: PR - 11/24/2006
Well Name/No:GM #442-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:CACOC46604
Facility Status:PRStatus Date11/24/2006
FacilityID:288057LocationID:335430
County:GARFIELD #045Location:SENE 27 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5680 ft.
Basin:PICEANCE BASIN  
Planned Location:2189FNL  1027 FELLat/Long: 39.496440 / -108.088840Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.496451 / -108.088843Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/2/2006             Measured TD: 7215 ft.    Vertical TD: 7170 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/2/2006
Wellbore PermitDIRECTIONAL
Permit #:20065185 Expiration Date:11/21/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1872 FNL  476 FEL
Bottom Hole Location:Sec:27 Twp: 6S 96W Footage: 1872 FNL  476 FEL
Proposed Depth/Form:7226 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-13 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/4/2007
Spud Date:1/26/2007Spud Date Is:ACTUAL
Measured TD:7215 ft.Measured PB depth:7182 ft.
True Vertical TD:7170 ft.True Vertical PB depth:
Top PZ Location:Sec:27 Twp: 6S 96WFootage: 1866 FNL  477 FEL
Bottom Hole Location:Sec:27 Twp: 6S 96WFootage: 1866 FNL  477 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1134 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7206 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 822, Top: 2400 ft., Bottom: 7206 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2147 ft.NN
MESAVERDE3964 ft.NN
CAMEO6626 ft.NN
ROLLINS7088 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/5/2007                  Interval Top: 5388 ft.    Interval Bottom: 6989 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/28/2007Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2007
Treatment Summary:3004 GALS 7 1/2% HCL; 747300 # 30/50 SAND; 21027 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:6516 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 906
MCF_GAS 1142
TUBING_PRESS 746
Perforation Data:
Interval Top:5388 ft.# Of Holes:106
Interval Bottom:6989 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)13
Total Gas Produced (MCF)10532
GOR810153
GOR DeterminationMCFE
Average BOE per Day5.012
Average MCFE per Day29.075

 Federal Financial Assurance  i 

 Tribal Well  i No