Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13128
Well Classification: GW Status: PR - 11/17/2006
Well Name/No:CHEVRON #GM 414-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC23794
Facility Status:PRStatus Date11/17/2006
FacilityID:287992LocationID:335183
County:GARFIELD #045Location:SESW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5724 ft.
Basin:PICEANCE BASIN  
Planned Location:337FSL  1443 FWLLat/Long: 39.503320 / -108.136720Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.503324 / -108.136728Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/4/2006             Measured TD: 7057 ft.    Vertical TD: 6921 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/4/2006
Wellbore PermitDIRECTIONAL
Permit #:20065164 Expiration Date:11/16/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1211 FSL  746 FWL
Bottom Hole Location:Sec:20 Twp: 6S 96W Footage: 1211 FSL  746 FWL
Proposed Depth/Form:7094 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:N/A
Spud Date:4/29/2007Spud Date Is:ACTUAL
Measured TD:7057 ft.Measured PB depth:7019 ft.
True Vertical TD:6921 ft.True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6S 96WFootage: 1205 FSL  755 FWL
Bottom Hole Location:Sec:20 Twp: 6S 96WFootage: 1205 FSL  755 FWL
Log Types:CBL; HIGH RESOLUCTION, SPECTRAL DEN,DUAL SPACED NEU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1137 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1137 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7043 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 855, Top: 2050 ft., Bottom: 7043 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2169 ft.NN
MESAVERDE3919 ft.NN
CAMEO6484 ft.NN
ROLLINS6970 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/4/2007                  Interval Top: 5189 ft.    Interval Bottom: 6897 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/17/2007Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2007
Treatment Summary:4049 GALS 7 1/2% HCL; 1109500 # 30/50 # 30/50 SAND; 33533 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6439 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1546
MCF_GAS 1406
TUBING_PRESS 1409
Perforation Data:
Interval Top:5189 ft.# Of Holes:150
Interval Bottom:6897 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)62
Total Gas Produced (MCF)29594
GOR477322
GOR DeterminationMCFE
Average BOE per Day14.151
Average MCFE per Day82.086

 Federal Financial Assurance  i Y

 Tribal Well  i No