Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13096
Well Classification: GW Status: SI - 11/1/2025
Well Name/No:LONG RIDGE #01B M15 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:287960LocationID:335865
County:GARFIELD #045Location:SWSW 15 5S95W 6
Field:GRAND VALLEY - #31290Elevation:8355 ft.
Basin:PICEANCE BASIN  
Planned Location:1241FSL  503 FWLLat/Long: 39.609965 / -108.048173Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.609983 / -108.048175Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2025             Measured TD: 12280 ft.    Vertical TD: 12082 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/7/2012
Proposed Top PZ Location:Sec:21 Twp: 5S 95W Footage: 148 FNL  556 FWL
Bottom Hole Location:Sec:21 Twp: 5S 95W Footage: 148 FNL  556 FWL
Proposed Depth/Form:12294 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11294 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1300, Top: 8000 ft., Bottom: 12294 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12294 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 600, Top: , Bottom: 12294 ft.

Wellbore Completed
Completion Date:8/18/2010
Spud Date:8/5/2010Spud Date Is:ACTUAL
Measured TD:12280 ft.Measured PB depth:12207 ft.
True Vertical TD:12082 ft.True Vertical PB depth:12009 ft.
Top PZ Location:Sec:21 Twp: 5S 95WFootage: 148 FNL  556 FWL
Bottom Hole Location:Sec:21 Twp: 5S 95WFootage: 148 FNL  556 FWL
Log Types:RST-CBL (combined) logs to be run when rig moves off location.
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 123 ft., Weight: 94 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 3058 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1762, Top: 0 ft., Bottom: 3058 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12250 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 3440 ft., Bottom: 12250 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.4197 ft.
WASATCH4197 ft.5716 ft.
FORT UNION5176 ft.8552 ft.
OHIO CREEK8552 ft.8856 ft.
WILLIAMS FORK8856 ft.11706 ft.
CAMEO11706 ft.12056 ft.
ROLLINS12056 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 11/1/2025                 Interval Top: 9344 ft.    Interval Bottom: 11948 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:11/9/2010Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/29/2010
Treatment Summary:Completed 7 stages of initial completion using 1,575,108 lbs 30/50 white sand and 53,253 bbl slickwater, led with 5500 gal 7.5% acid. 11/3/2010 Stage 1 - 11,809-11948' @ 2 spf, 20 holes total. Frac'd with 141,309 lb 30/50 white sand and 4731 bbl slickwater, led with 500 gal 7.5% acid Stage 2 - 11,549-11,718' @ 2 spf, 30 holes total. Frac'd 204,307 lb 30/50 white sand and 6652 bbl slickwater, led with 500 gal 7.5% acid 11/29/2010 Stage 3 - 11,200-11,388' @ 2 spf, 26 holes total. Frac'd 189,000 lb 30/50 white sand and 6362 bbl slickwater, led with 1000 gal 7.5% acid Stage 4 - 10,926-11,157' @ 2 spf, 30 holes total. Frac'd 178,760 lb 30/50 white sand and 6240 bbl slickwater, led with 500 gal 7.5% acid Stage 5 - 10,721-10,885' @ 2 spf, 18 holes total. Frac'd 104,300 lb 30/50 white sand and 3803 bbl slickwater, led with 500 gal 7.5% acid Stage 6 - 10,500-10,657' @ 2 spf, 30 holes total. Frac'd 176,932 lb 30/50 white sand and 5994 bbl slickwater, led with 500 gal 7.5% acid Stage 7 - 10,181-10,430' @ 2 spf, 38 holes total. Frac'd 282,500 lb 30/50 white sand and 9134 bbl slickwater, led with 500 gal 7.5% acid Stage 8 - 9,738-10,016' @ 2 spf, 30 holes total. Frac'd 144,000 lb 30/50 white sand and 4967 bbl slickwater, led with 500 gal 7.5% acid Stage 9 - 9,344-9,628' @ 2 spf, 30 holes total. Frac'd 154,000 lb 30/50 white sand and 5370 bbl slickwater, led with 500 gal 7.5% acid
Formation Treatment
Treatment Date:11/3/2010
Treatment Summary:Perf'd & frac'd inital 2 of 7 stages: 11,549' - 11,718' - 30 holes total @ 2 spf. Frac'd with 204,307 lbs 30/50 white sand and 6,652 bbl slick water. Led with 1000 gal 7.5% acid. 11,809' - 11,948' - 20 holes total at 2 spf. Frac'd with 141,309 lbs 30/50 white sand and 4,731 bbl slick water. Led with 500 gal 7.5% acid.
Tubing Size:2.375 in.Tubing Setting Depth:11553 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 265
BTU_GAS 1128
CALC_BBLS_H2O 265
CALC_MCF_GAS 310
CASING_PRESS 2060
MCF_GAS 310
TUBING_PRESS 1300
Perforation Data:
Interval Top:9344 ft.# Of Holes:50
Interval Bottom:11948 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)69
Total Gas Produced (MCF)12563
GOR182072
GOR DeterminationMCFE
Average BOE per Day6.130
Average MCFE per Day35.540

 Federal Financial Assurance  i 

 Tribal Well  i No