|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 12280 ft. Vertical TD: 12082 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2012 | | Proposed Top PZ Location: | Sec:21 Twp: 5S 95W | Footage: 148 FNL 556 FWL | | Bottom Hole Location: | Sec:21 Twp: 5S 95W | Footage: 148 FNL 556 FWL | | Proposed Depth/Form: | 12294 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 11294 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1300, Top: 8000 ft., Bottom: 12294 ft. | | Casing: | String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12294 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 12294 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/18/2010 | | Spud Date: | 8/5/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12280 ft. | Measured PB depth: | 12207 ft. | | True Vertical TD: | 12082 ft. | True Vertical PB depth: | 12009 ft. | | Top PZ Location: | Sec:21 Twp: 5S 95W | Footage: 148 FNL 556 FWL | | Bottom Hole Location: | Sec:21 Twp: 5S 95W | Footage: 148 FNL 556 FWL | | Log Types: | RST-CBL (combined) logs to be run when rig moves off location. | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 123 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 3058 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1762, Top: 0 ft., Bottom: 3058 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12250 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 3440 ft., Bottom: 12250 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 4197 ft. | | | | WASATCH | 4197 ft. | 5716 ft. | | | | FORT UNION | 5176 ft. | 8552 ft. | | | | OHIO CREEK | 8552 ft. | 8856 ft. | | | | WILLIAMS FORK | 8856 ft. | 11706 ft. | | | | CAMEO | 11706 ft. | 12056 ft. | | | | ROLLINS | 12056 ft. | | | |
Formation WMFK Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 9344 ft. Interval Bottom: 11948 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/9/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/29/2010 | | Treatment Summary: | Completed 7 stages of initial completion using 1,575,108 lbs 30/50 white sand and 53,253 bbl slickwater, led with 5500 gal 7.5% acid.
11/3/2010
Stage 1 - 11,809-11948' @ 2 spf, 20 holes total. Frac'd with 141,309 lb 30/50 white sand and 4731 bbl slickwater, led with 500 gal 7.5% acid
Stage 2 - 11,549-11,718' @ 2 spf, 30 holes total. Frac'd 204,307 lb 30/50 white sand and 6652 bbl slickwater, led with 500 gal 7.5% acid
11/29/2010
Stage 3 - 11,200-11,388' @ 2 spf, 26 holes total. Frac'd 189,000 lb 30/50 white sand and 6362 bbl slickwater, led with 1000 gal 7.5% acid
Stage 4 - 10,926-11,157' @ 2 spf, 30 holes total. Frac'd 178,760 lb 30/50 white sand and 6240 bbl slickwater, led with 500 gal 7.5% acid
Stage 5 - 10,721-10,885' @ 2 spf, 18 holes total. Frac'd 104,300 lb 30/50 white sand and 3803 bbl slickwater, led with 500 gal 7.5% acid
Stage 6 - 10,500-10,657' @ 2 spf, 30 holes total. Frac'd 176,932 lb 30/50 white sand and 5994 bbl slickwater, led with 500 gal 7.5% acid
Stage 7 - 10,181-10,430' @ 2 spf, 38 holes total. Frac'd 282,500 lb 30/50 white sand and 9134 bbl slickwater, led with 500 gal 7.5% acid
Stage 8 - 9,738-10,016' @ 2 spf, 30 holes total. Frac'd 144,000 lb 30/50 white sand and 4967 bbl slickwater, led with 500 gal 7.5% acid
Stage 9 - 9,344-9,628' @ 2 spf, 30 holes total. Frac'd 154,000 lb 30/50 white sand and 5370 bbl slickwater, led with 500 gal 7.5% acid | | Formation Treatment | | Treatment Date: | 11/3/2010 | | Treatment Summary: | Perf'd & frac'd inital 2 of 7 stages:
11,549' - 11,718' - 30 holes total @ 2 spf. Frac'd with 204,307 lbs 30/50 white sand and 6,652 bbl slick water. Led with 1000 gal 7.5% acid.
11,809' - 11,948' - 20 holes total at 2 spf. Frac'd with 141,309 lbs 30/50 white sand and 4,731 bbl slick water. Led with 500 gal 7.5% acid. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11553 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 265 | | BTU_GAS | 1128 | | CALC_BBLS_H2O | 265 | | CALC_MCF_GAS | 310 | | CASING_PRESS | 2060 | | MCF_GAS | 310 | | TUBING_PRESS | 1300 |
| | Perforation Data: | | Interval Top: | 9344 ft. | # Of Holes: | 50 | | Interval Bottom: | 11948 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 69 |
| Total Gas Produced (MCF) | 12563 |
| GOR | 182072 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.130 |
| Average MCFE per Day | 35.540 |
| Federal Financial Assurance | i | |
|
|