|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2022 Measured TD: 12119 ft. Vertical TD: 12099 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2011 | | Proposed Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 1060 FSL 385 FWL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 1060 FSL 385 FWL | | Proposed Depth/Form: | 12280 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12338 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1300, Top: 8000 ft., Bottom: 12338 ft. | | Casing: | String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12338 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 12338 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/2/2010 | | Spud Date: | 7/17/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12119 ft. | Measured PB depth: | 12119 ft. | | True Vertical TD: | 12099 ft. | True Vertical PB depth: | 12099 ft. | | Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 1124 FSL 649 FWL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 1124 FSL 649 FWL | | Log Types: | RST-CBL (Combined) logs will be run when rig moves off location. (then, this isn't the "final" Form 5) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 123 ft., Weight: 52.7 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 123 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 3323 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1762, Top: 0 ft., Bottom: 3323 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12103 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 956, Top: 7500 ft., Bottom: 12103 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | | | | WASATCH | 4187 ft. | | | | | FORT UNION | 5687 ft. | | | | | OHIO CREEK | 8487 ft. | | | | | WILLIAMS FORK | 8787 ft. | | | | | CAMEO | 11637 ft. | | | | | ROLLINS | 11987 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 8/1/2022 Interval Top: 9637 ft. Interval Bottom: 11590 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 11/15/2010 | Choke Size: | 18.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2010 | | Treatment Summary: | Perf'd & Frac'd initial completion in 6 stages using 1,216,087 lbs 30/50 white sand and 41,222 bbls slickwater. Led with 4,000 gal 7.5% acid.
Stage 1 - Perf'd 11,472' - 11,590' w/ 2 SPF (20 holes total). Frac'd with 145,174 lbs 30/50 white sand, 4,911 bbls slickwater & led with 500 gal 7.5% acid.
Stage 2 - Perf'd 11,033' - 11,260' w/ 2 SPF (32 holes total). Frac'd with 157,748 lbs 30/50 white sand, 5,645 bbls slickwater, led with 500 gal 7.5% acid.
Stage 3 - Perf'd 10,378' - 10,632' w/ 2 SPF (22 holes total). Frac'd with 125,407 lbs 30/50 white sand, 7,828 bbls slickwater, led with 500 gal 7.5% acid.
Stage 4 - Perf'd 10,107' - 10,311' w/ 2 SPF (43 holes total). Frac'd with 222,376 lbs 30/50 white sand, 7,828 bbls slickwater, led with 1000 7.5% acid.
Stage 5 - Perf'd 9,891' - 10,041' w/ 2 SPF (28 holes total). Frac'd with 174,340 lbs 30/50 white sand, 5,856 bbls slickwater, led with 500 gal 7.5% acid.
Stage 6 - Perf'd 9,637' - 9,801' w/ 2 SPF (40 holes total). Frac'd with 391,042 lbs 30/50 white sand, 12,555 bbls slickwater, led with 1000 gal 7.5% acid. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11370 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/10/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 221 | | BTU_GAS | 1115 | | CALC_BBLS_H2O | 221 | | CALC_MCF_GAS | 1250 | | CASING_PRESS | 680 | | MCF_GAS | 1250 | | TUBING_PRESS | 1400 |
| | Perforation Data: | | Interval Top: | 9637 ft. | # Of Holes: | 185 | | Interval Bottom: | 11590 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 55 |
| Total Gas Produced (MCF) | 9952 |
| GOR | 180945 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.857 |
| Average MCFE per Day | 28.162 |
| Federal Financial Assurance | i | |
|
|