|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2026 Measured TD: 12345 ft. Vertical TD: 12162 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2011 | | Proposed Top PZ Location: | Sec:15 Twp: 5S 95W | Footage: 1530 FSL 960 FWL | | Bottom Hole Location: | Sec:15 Twp: 5S 95W | Footage: 1530 FSL 960 FWL | | Proposed Depth/Form: | 12329 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12329 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1300, Top: 8000 ft., Bottom: 12329 ft. | | Casing: | String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12329 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 12329 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/18/2010 | | Spud Date: | 9/2/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12345 ft. | Measured PB depth: | 12345 ft. | | True Vertical TD: | 12162 ft. | True Vertical PB depth: | 12162 ft. | | Top PZ Location: | Sec:16 Twp: 5S 95W | Footage: 2502 FNL 352 FEL | | Bottom Hole Location: | Sec:16 Twp: 5S 95W | Footage: 2502 FNL 497 FEL | | Log Types: | RST-CBL (Combined) to be logged after rig moves of pad. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 123 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 123 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 123 ft., Depth: 2805 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1330, Top: 0 ft., Bottom: 2805 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 2805 ft., Depth: 8868 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 8868 ft., Depth: 12315 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 6000 ft., Bottom: 12315 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 4289 ft. | | | | | FORT UNION | 5823 ft. | | | | | WASATCH | 5823 ft. | | | | | OHIO CREEK | 8685 ft. | | | | | WILLIAMS FORK | 8989 ft. | | | | | CAMEO | 11839 ft. | | | | | ROLLINS | 12189 ft. | | | |
Formation WMFK Formation Classification: GW Status: PR - 1/1/2026 Interval Top: 9376 ft. Interval Bottom: 11951 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 1/9/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/2/2010 | | Treatment Summary: | Perf and frac 7 total stages of initial completion using 883,059 lbs 30/50 white sand and 31,814 bbl slickwater, led with 3500 gal 7.5% acid.
10-30-2011
Stage 1 - 11,758-11,951', total 20 holes @ 2 SPF. Frac'd with 141,481 lb 30/50 white sand and 4777 bbl slickwater, led with 500 gal 7.5% acid
Stage 2 - 11,403-11,569', total 22 holes @ 2 spf. Frac'd with 131,018 lb 30/50 white sand and 4642 bbl slickwater, led with 500 gal 7.5% acid.
12/2/2010
Stage 3 - 10,934-11,109', total 28 holes @ 2 spf. Frac'd with 133,000 ;b 30/50 white sand and 4753 bbl slickwater, led with 500 gal 7.5% acid.
Stage 4 - 10,460-10,784', total 30 holes @ 2 spf. Frac'd with 127,560 lb 30/50 white sand and 5646 bbl slickwater, led with 500 gal 7.5% acid.
Stage 5 - 10,031-10,245', total 36 holes @ 2 spf. Frac'd with 136,000 lb 30/50 white sand and 4863 bbl slickwater, led with 500 gal 7.5% acid.
Stage 6 - 9,705-9,930', total 30 holes @ 2 spf. Frac'd with 118,000 lb 30/50 white sand and 4564 bbl slickwater, led with 500 gal 7.5% acid.
Stage 7 - 9,376-9,576', total 20 holes @ 2 spf. Frac'd with 96,000 lb 30/50 white sand and 2569 bbl slickwater, led with 500 gal 7.5% acid. | | Formation Treatment | | Treatment Date: | 11/2/2010 | | Treatment Summary: | Frac'd first 2 stages of initial 7 stage frac 11/2/2010.
11,403' - 11,569' - 22 total holes @ 2 spf. Frac'd with 131,018 lbs 30/50 white sand and 4,642 bbl slickwater. Led with 500 gal 7.5% acid.
11,758' - 11,951' - 20 total holes @ 2 spf. Frac'd with 141,481 lbs 30/50 white sand and 4,777 bbl slickwater. Led with 500 gal 7.5% acid. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11700 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 109 | | BTU_GAS | 979 | | CALC_BBLS_H2O | 109 | | CALC_MCF_GAS | 220 | | CASING_PRESS | 1180 | | MCF_GAS | 220 | | TUBING_PRESS | 530 |
| | Perforation Data: | | Interval Top: | 9376 ft. | # Of Holes: | 186 | | Interval Bottom: | 11951 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 56 |
| Total Gas Produced (MCF) | 10559 |
| GOR | 188553 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.099 |
| Average MCFE per Day | 29.585 |
| Federal Financial Assurance | i | |
|
|