Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2023 Measured TD: 12240 ft. Vertical TD: 12133 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2011 | | Proposed Top PZ Location: | Sec:22 Twp: 5S 95W | Footage: 105 FNL 910 FWL | | Bottom Hole Location: | Sec:22 Twp: 5S 95W | Footage: 105 FNL 910 FWL | | Proposed Depth/Form: | 12407 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: , Depth: 90 ft., Weight: 55 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 2500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12407 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1300, Top: 8000 ft., Bottom: 12332 ft. | | Casing: | String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12407 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 600, Top: , Bottom: 12332 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/18/2010 | | Spud Date: | 8/5/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 12240 ft. | Measured PB depth: | 12240 ft. | | True Vertical TD: | 12133 ft. | True Vertical PB depth: | 12133 ft. | | Top PZ Location: | Sec:22 Twp: 5S 95W | Footage: 148 FNL 556 FWL | | Bottom Hole Location: | Sec:22 Twp: 5S 95W | Footage: 148 FNL 556 FWL | | Log Types: | RST, CBL,MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 123 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 123 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2460 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1762, Top: 0 ft., Bottom: 2460 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12218 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 3440 ft., Bottom: 12218 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OHIO CREEK | 8436 ft. | 8715 ft. | | | | WILLIAMS FORK | 8715 ft. | 11695 ft. | | | | CAMEO | 11695 ft. | 12033 ft. | | | | ROLLINS | 12033 ft. | 12240 ft. | | |
Formation WMFK Formation Classification: GW Status: PR - 4/1/2023 Interval Top: 9276 ft. Interval Bottom: 11810 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 12/15/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2010 | | Treatment Summary: | Completed intial completion procedure with 8 perf/frac stages using 1,370,164 lbs 30/50 sand, 46,824 bbls slickwater fluid and 4,000 gal 7.5% acid.
Stage 1 - 11,571-11,810, 34 holes @ 2 spf. Frac'd w/ 288,000 lbs 30/50 white sand, 9,211 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 2 - 11,317-11,478, 22 holes @ 2 spf. Frac'd w/ 156,000 lbs 30/50 white sand, 5,646 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 3 - 10,867-11064, 30 holes @ 2 spf. Frac'd w/ 221,880 lbs 30/50 white sand, 7,520 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 4 - 10,605-10,818, 28 holes @ 2 spf. Frac'd w/ 167,544 lbs 30/50 white sand, 5,693 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 5 - 10,351-10,504, 20 holes @ 2 spf. Frac'd w/ 97,500 lbs 30/50 white sand, 3,553 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 6 - 9,993-10,256, 36 holes @ 2 spf. Frac'd w/ 180,000 lbs 30/50 white sand, 6,097 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 7- 9,722-9,885, 22 holes @ 2 spf. Frac'd w/ 116,000 lbs 30/50 white sand, 4,125 bbls slickwater, led w/ 500 gal 7.5% acid
Stage 8 - 9,276-9,514, 28 holes @ 2 spf. Frac'd w/ 143,240 30/50 white sand, 4,979 bbls slickwater, led w/ 500 gal 7.5% acid |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11494 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 217 | | BTU_GAS | 1057 | | CALC_BBLS_H2O | 217 | | CALC_MCF_GAS | 283 | | CASING_PRESS | 2100 | | MCF_GAS | 283 | | TUBING_PRESS | 1380 |
| | Perforation Data: | | Interval Top: | 9276 ft. | # Of Holes: | 220 | | Interval Bottom: | 11810 ft. | Hole Size: | 0.34 in. |
|
|