Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13061
Well Classification: GW Status: PR - 11/13/2006
Well Name/No:FEDERAL #GM 443-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62163
Facility Status:PRStatus Date11/13/2006
FacilityID:287824LocationID:335097
County:GARFIELD #045Location:SWSW 25 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5985 ft.
Basin:PICEANCE BASIN  
Planned Location:738FSL  796 FWLLat/Long: 39.488818 / -108.064534Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.488816 / -108.064529Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/25/2006             Measured TD: 8184 ft.    Vertical TD: 7533 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/25/2006
Wellbore PermitDIRECTIONAL
Permit #:20064920 Expiration Date:11/12/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2132 FSL  701 FEL
Bottom Hole Location:Sec:26 Twp: 6S 96W Footage: 2132 FSL  701 FEL
Proposed Depth/Form:8163 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:6/6/2007
Spud Date:5/30/2007Spud Date Is:ACTUAL
Measured TD:8184 ft.Measured PB depth:8132 ft.
True Vertical TD:7533 ft.True Vertical PB depth:
Top PZ Location:Sec:26 Twp: 6S 96WFootage: 2108 FSL  988 FEL
Bottom Hole Location:Sec:26 Twp: 6S 96WFootage: 2108 FSL  988 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1171 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 1171 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8162 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 3350 ft., Bottom: 8161 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2670 ft.NN
WILLIAMS FORK4976 ft.NN
CAMEO7484 ft.NN
ROLLINS8074 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/1/2008                  Interval Top: 6381 ft.    Interval Bottom: 7976 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/15/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/2007
Treatment Summary:3624 GALS 7 1/2% HCL; 1098000 #30/50 SAND; 43247 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7464 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1113
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1416
MCF_GAS 1038
TUBING_PRESS 1176
Perforation Data:
Interval Top:6381 ft.# Of Holes:139
Interval Bottom:7976 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)44
Total Gas Produced (MCF)17371
GOR394795
GOR DeterminationMCFE
Average BOE per Day8.326
Average MCFE per Day48.307

 Federal Financial Assurance  i Y

 Tribal Well  i No