Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-13055
Well Classification: GW Status: PR - 11/13/2006
Well Name/No:FEDERAL #GM 323-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27743
Facility Status:PRStatus Date11/13/2006
FacilityID:287830LocationID:335097
County:GARFIELD #045Location:SWSW 25 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5985 ft.
Basin:PICEANCE BASIN  
Planned Location:767FSL  832 FWLLat/Long: 39.488899 / -108.064408Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.488897 / -108.064402Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/25/2006             Measured TD: 8220 ft.    Vertical TD: 7678 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/25/2006
Wellbore PermitDIRECTIONAL
Permit #:20064918 Expiration Date:11/12/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2296 FSL  2075 FWL
Bottom Hole Location:Sec:25 Twp: 6S 96W Footage: 2296 FSL  2075 FWL
Proposed Depth/Form:8041 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:4/21/2007
Spud Date:4/11/2007Spud Date Is:ACTUAL
Measured TD:8220 ft.Measured PB depth:8173 ft.
True Vertical TD:7678 ft.True Vertical PB depth:
Top PZ Location:Sec:25 Twp: 6S 96WFootage: 2460 FSL  2518 FWL
Bottom Hole Location:Sec:25 Twp: 6S 96WFootage: 2460 FSL  2518 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD, RMTE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 1184 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: , Bottom: 1184 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8194 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 806, Top: 1800 ft., Bottom: 8194 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2648 ft.NN
WILLIAMS FORK4905 ft.NN
CAMEO7582 ft.NN
ROLLINS8101 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/31/2007                Interval Top: 6307 ft.    Interval Bottom: 7972 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/5/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/30/2007
Treatment Summary:3597 GALS 7 1/2 % HCL; 853900 # 30/50 SAND , 44190 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7573 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1110
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1423
MCF_GAS 997
TUBING_PRESS 1279
Perforation Data:
Interval Top:6307 ft.# Of Holes:116
Interval Bottom:7972 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)55
Total Gas Produced (MCF)28818
GOR523963
GOR DeterminationMCFE
Average BOE per Day13.766
Average MCFE per Day79.825

 Federal Financial Assurance  i Y

 Tribal Well  i No