Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12959
Well Classification: GW Status: PR - 10/5/2006
Well Name/No:MAHAFFEY #PA 412-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/5/2006
FacilityID:287283LocationID:334597
County:GARFIELD #045Location:NWSW 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5242 ft.
Basin:PICEANCE BASIN  
Planned Location:1883FSL  1126 FWLLat/Long: 39.478780 / -107.952100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.478783 / -107.952104Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/24/2006             Measured TD: 7904 ft.    Vertical TD: 7656 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/24/2006
Wellbore Permit
Permit #:20064348 Expiration Date:10/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2134 FNL  501 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 2134 FNL  501 FWL
Proposed Depth/Form:7981 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:4/18/2007
Spud Date:4/10/2007Spud Date Is:ACTUAL
Measured TD:7904 ft.Measured PB depth:7860 ft.
True Vertical TD:7656 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 2188 FNL  484 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 2188 FNL  484 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2090 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 468, Top: 0 ft., Bottom: 2090 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7890 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1011, Top: 2099 ft., Bottom: 7890 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1872 ft.NN
MESAVERDE4335 ft.NN
CAMEO7111 ft.NN
ROLLINS7835 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/24/2007                 Interval Top: 5824 ft.    Interval Bottom: 7637 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/7/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/6/2007
Treatment Summary:3013 GALS 7 1/2% HCL, 667,000# 30/50 SAND, 16,331 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7153 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 638
MCF_GAS 1431
TUBING_PRESS 589
Perforation Data:
Interval Top:5824 ft.# Of Holes:120
Interval Bottom:7637 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)16840
GOR765454
GOR DeterminationMCFE
Average BOE per Day8.019
Average MCFE per Day46.513

 Federal Financial Assurance  i 

 Tribal Well  i No