Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12958
Well Classification: GW Status: PR - 10/5/2006
Well Name/No:MAHAFFY #PA 512-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/5/2006
FacilityID:287284LocationID:334597
County:GARFIELD #045Location:NWSW 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5242 ft.
Basin:PICEANCE BASIN  
Planned Location:1871FSL  1107 FWLLat/Long: 39.478740 / -107.952160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.478749 / -107.952170Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/24/2006             Measured TD: 7804 ft.    Vertical TD: 7654 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/24/2006
Wellbore PermitDIRECTIONAL
Permit #:20064349 Expiration Date:10/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 2496 FNL  545 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 2496 FNL  545 FWL
Proposed Depth/Form:7861 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:4/9/2007
Spud Date:4/1/2007Spud Date Is:ACTUAL
Measured TD:7804 ft.Measured PB depth:7760 ft.
True Vertical TD:7654 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 2550 FNL  535 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 2550 FNL  535 FWL
Log Types:CBL; HGIH RESOLUTION IND, SPECTRAL DENS, DUAL SPACED NEU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2048 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 391, Top: 0 ft., Bottom: 2048 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7791 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 3078 ft., Bottom: 7791 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1834 ft.NN
MESAVERDE4233 ft.NN
CAMEO7015 ft.NN
ROLLINS7719 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/24/2007                 Interval Top: 5732 ft.    Interval Bottom: 7674 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/11/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2007
Treatment Summary:42910 GALS 7 1/2% HCL, 736,900# 30/50 SAND, 17,742 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7219 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 522
MCF_GAS 1103
TUBING_PRESS 480
Perforation Data:
Interval Top:5732 ft.# Of Holes:125
Interval Bottom:7674 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)25
Total Gas Produced (MCF)19622
GOR784880
GOR DeterminationMCFE
Average BOE per Day9.339
Average MCFE per Day54.193

 Federal Financial Assurance  i 

 Tribal Well  i No