Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12941
Well Classification: GW Status: PR - 10/4/2006
Well Name/No:MAHAFFEY #PA 523-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/4/2006
FacilityID:287266LocationID:334597
County:GARFIELD #045Location:NWSW 36 6S95W 6
Field:PARACHUTE - #67350Elevation:5242 ft.
Basin:PICEANCE BASIN  
Planned Location:1855FSL  1100 FWLLat/Long: 39.478700 / -107.952190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.478702 / -107.952194Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/24/2006             Measured TD: 7765 ft.    Vertical TD: 7562 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/24/2006
Wellbore PermitDIRECTIONAL
Permit #:20064355 Expiration Date:10/3/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1437 FSL  2460 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95W Footage: 1437 FSL  2460 FWL
Proposed Depth/Form:7850 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-35 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/16/2007
Spud Date:3/8/2007Spud Date Is:ACTUAL
Measured TD:7765 ft.Measured PB depth:7716 ft.
True Vertical TD:7562 ft.True Vertical PB depth:
Top PZ Location:Sec:36 Twp: 6S 95WFootage: 1507 FSL  2456 FWL
Bottom Hole Location:Sec:36 Twp: 6S 95WFootage: 1507 FSL  2456 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2033 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 2033 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7749 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1011, Top: 2100 ft., Bottom: 7749 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1834 ft.NN
MESAVERDE4245 ft.NN
CAMEO6979 ft.NN
ROLLINS7682 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/26/2007                 Interval Top: 5572 ft.    Interval Bottom: 7601 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/8/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2007
Treatment Summary:4196 GALS 7 1/2% HCL, 831,700# 30/50 SAND, 19,886 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7219 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/26/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1434
MCF_GAS 1156
TUBING_PRESS 1317
Perforation Data:
Interval Top:5572 ft.# Of Holes:140
Interval Bottom:7601 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)24736
GOR824533
GOR DeterminationMCFE
Average BOE per Day11.761
Average MCFE per Day68.227

 Federal Financial Assurance  i 

 Tribal Well  i No