|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: PA - 12/21/2020 Measured TD: 9223 ft. Vertical TD: 9166 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW PA - 12/21/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20076442 | Expiration Date: | 12/26/2008 | | Proposed Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 1765 FNL 1946 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 1765 FNL 1946 FWL | | Proposed Depth/Form: | 9323 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/29/2008 | | Spud Date: | 3/14/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 9223 ft. | Measured PB depth: | 9128 ft. | | True Vertical TD: | 9166 ft. | True Vertical PB depth: | 9071 ft. | | Top PZ Location: | Sec:24 Twp: 6S 97W | Footage: 1765 FNL 1946 FWL | | Bottom Hole Location: | Sec:24 Twp: 6S 97W | Footage: 1765 FNL 1946 FWL | | Log Types: | PNDL/GR; PND-S CASED HOLE TRIPLE COMBO; CBL/GR; MUDLOG | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 52# , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2618 ft., Weight: 36# , Citings Type: ACTUAL | | Cement: | Sacks: 1688, Top: 0 ft., Bottom: 2618 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9180 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 2896 ft., Bottom: 9180 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 4321 ft. | | N | N | | FORT UNION | 4809 ft. | | N | N | | WILLIAMS FORK | 6139 ft. | | N | N | | CAMEO | 8551 ft. | | N | N | | ROLLINS | 9023 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: AB - 7/30/2010 Interval Top: 6762 ft. Interval Bottom: 8798 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | NONE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 224 | | BTU_GAS | 1068 | | CALC_BBLS_H2O | 224 | | CALC_MCF_GAS | 705 | | CASING_PRESS | 1150 | | MCF_GAS | 705 |
| | Perforation Data: | | Interval Top: | 6762 ft. | # Of Holes: | 156 | | Interval Bottom: | 8798 ft. | Hole Size: | 0.37 in. |
|
Formation OHCRK Formation Classification: DSPW Status: AB - 12/21/2020 Interval Top: 6240 ft. Interval Bottom: 6441 ft.| Completed Information for Formation OHIO CREEK | | 1st Production Date: | 6/16/2010 | Choke Size: | | | Formation Name: | OHIO CREEK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/8/2010 | | Treatment Summary: | FRAC'D USING 24 BBLS 7 1/2% HCL, 4521 BBLS OF SLICKWATER GEL AND 139801 LBS OF 20/40 MESH WHITE SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation OHCRK. |
| | Perforation Data: | | Interval Top: | 6240 ft. | # Of Holes: | 75 | | Interval Bottom: | 6441 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/21/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|