Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12832
Well Classification: GW Status: PR - 9/21/2006
Well Name/No:WILLIAMS #GM 511-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50794
Facility Status:PRStatus Date9/21/2006
FacilityID:286914LocationID:335144
County:GARFIELD #045Location:NWNW 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5593 ft.
Basin:PICEANCE BASIN  
Planned Location:467FNL  634 FWLLat/Long: 39.486550 / -108.120670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.486549 / -108.120680Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2006             Measured TD: 6725 ft.    Vertical TD: 6697 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2006
Wellbore PermitDIRECTIONAL
Permit #:20063932 Expiration Date:9/20/2007
Proposed Top PZ Location:Sec: Twp: Footage: 837 FNL  338 FWL
Bottom Hole Location:Sec:33 Twp: 6S 96W Footage: 837 FNL  338 FWL
Proposed Depth/Form:6727 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-8 , Unit Acreage: 160, Drill Unit: NW4

Wellbore Completed
Completion Date:2/21/2007
Spud Date:2/10/2007Spud Date Is:ACTUAL
Measured TD:6725 ft.Measured PB depth:6670 ft.
True Vertical TD:6697 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 6S 96WFootage: 827 FNL  359 FWL
Bottom Hole Location:Sec:33 Twp: 6S 96WFootage: 827 FNL  359 FWL
Log Types:CBL; DSN/SD/HRI; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1123 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6698 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 804, Top: 2370 ft., Bottom: 6698 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1800 ft.NN
FORT UNION2120 ft.NN
MESAVERDE3599 ft.NN
CAMEO6009 ft.NN
ROLLINS6463 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/14/2007                 Interval Top: 4817 ft.    Interval Bottom: 6365 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/30/2007Choke Size:0.266 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/29/2007
Treatment Summary:3535 GALS 7 1/2% HCL; 789,000# 30/50 SAND; 18,880 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6067 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/14/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1039
MCF_GAS 1068
TUBING_PRESS 845
Perforation Data:
Interval Top:4817 ft.# Of Holes:136
Interval Bottom:6365 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)9855
GOR821250
GOR DeterminationMCFE
Average BOE per Day4.691
Average MCFE per Day27.201

 Federal Financial Assurance  i 

 Tribal Well  i No