Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12822
Well Classification: GW Status: PR - 3/12/2008
Well Name/No:FEDERAL #RWF 433-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date3/12/2008
FacilityID:286864LocationID:335743
County:GARFIELD #045Location:NESE 8 6S94W 6
Field:RULISON - #75400Elevation:5940 ft.
Basin:PICEANCE BASIN  
Planned Location:1785FSL  522 FELLat/Long: 39.537360 / -107.904560Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.537369 / -107.904565Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/12/2008             Measured TD: 8936 ft.    Vertical TD: 8775 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/12/2008
Wellbore PermitDIRECTIONAL
Permit #:20081732 Expiration Date:5/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1743 FSL  1881 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 1743 FSL  1881 FEL
Proposed Depth/Form:8967 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:9/5/2008
Spud Date:8/20/2008Spud Date Is:ACTUAL
Measured TD:8936 ft.Measured PB depth:8885 ft.
True Vertical TD:8775 ft.True Vertical PB depth:8724 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 1762 FSL  1876 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 1762 FSL  1876 FEL
Log Types:CBL; HIGH RESOLUTION IND/ DEN/ NEU, GR, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2833 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 731, Top: 0 ft., Bottom: 2833 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8919 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1297, Top: 2710 ft., Bottom: 8919 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2585 ft.NN
MESAVERDE5158 ft.NN
CAMEO7942 ft.NN
ROLLINS8856 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/31/2009                 Interval Top: 6516 ft.    Interval Bottom: 8438 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/9/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/7/2008
Treatment Summary:2988 GALS 7 1/2% HCL; 770400# 20/40 SAND; 16699 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8013 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/31/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1123
CASING_PRESS 933
GRAVITY_OIL 55
MCF_GAS 921
TUBING_PRESS 702
Perforation Data:
Interval Top:6516 ft.# Of Holes:108
Interval Bottom:8438 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)62
Total Gas Produced (MCF)16092
GOR259548
GOR DeterminationMCFE
Average BOE per Day7.765
Average MCFE per Day45.064

 Federal Financial Assurance  i Y

 Tribal Well  i No