Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12820
Well Classification: GW Status: PR - 7/1/2023
Well Name/No:FEDERAL #RWF 533-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62160
Facility Status:PRStatus Date7/1/2023
FacilityID:286866LocationID:335743
County:GARFIELD #045Location:NESE 8 6S94W 6
Field:RULISON - #75400Elevation:5940 ft.
Basin:PICEANCE BASIN  
Planned Location:1816FSL  503 FELLat/Long: 39.537450 / -107.904480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.537454 / -107.904487Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2023             Measured TD: 9095 ft.    Vertical TD: 8827 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20073081 Expiration Date:7/8/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2473 FSL  2150 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 2473 FSL  2150 FEL
Proposed Depth/Form:9089 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:4/4/2008
Spud Date:3/16/2008Spud Date Is:ACTUAL
Measured TD:9095 ft.Measured PB depth:9030 ft.
True Vertical TD:8827 ft.True Vertical PB depth:8762 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 2487 FSL  2131 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 2487 FSL  2131 FEL
Log Types:CBL; HIGHT RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2862 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 801, Top: 0 ft., Bottom: 2862 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9077 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1318, Top: 3990 ft., Bottom: 9077 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2658 ft.NN
MESAVERDE5267 ft.NN
CAMEO8074 ft.NN
ROLLINS8969 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2023                  Interval Top: 6568 ft.    Interval Bottom: 8702 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/12/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:3000 GALS 7 1/2% HCL; 591800 # 20/40 SAND; 18013 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8348 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1412
MCF_GAS 958
TUBING_PRESS 1133
Perforation Data:
Interval Top:6568 ft.# Of Holes:101
Interval Bottom:8702 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)10
Total Gas Produced (MCF)2688
GOR268800
GOR DeterminationMCFE
Average BOE per Day1.296
Average MCFE per Day7.527

 Federal Financial Assurance  i Y

 Tribal Well  i No