Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12818
Well Classification: GW Status: PR - 6/12/2007
Well Name/No:FEDERAL #RWF 443-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date6/12/2007
FacilityID:286868LocationID:335743
County:GARFIELD #045Location:NESE 8 6S94W 6
Field:RULISON - #75400Elevation:5940 ft.
Basin:PICEANCE BASIN  
Planned Location:1811FSL  494 FELLat/Long: 39.537436 / -107.904456Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.537438 / -107.904459Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/12/2007             Measured TD: 8783 ft.    Vertical TD: 8773 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/12/2007
Wellbore PermitDIRECTIONAL
Permit #:20073411 Expiration Date:8/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2005 FSL  715 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 2005 FSL  715 FEL
Proposed Depth/Form:8886 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:4/19/2008
Spud Date:4/5/2008Spud Date Is:ACTUAL
Measured TD:8783 ft.Measured PB depth:7820 ft.
True Vertical TD:8773 ft.True Vertical PB depth:7810 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 2010 FSL  699 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 2010 FSL  699 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE, MUD, TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1115 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 326, Top: 0 ft., Bottom: 1115 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8763 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1303, Top: 3820 ft., Bottom: 8763 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2520 ft.NN
MESAVERDE5011 ft.NN
CAMEO7838 ft.NN
ROLLINS8747 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/31/2008                Interval Top: 6383 ft.    Interval Bottom: 8508 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/16/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:3532 GALS 7 1/2% HCL; 758300 # WHITE 20 SAND; 19859 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8013 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 1655
MCF_GAS 1020
TUBING_PRESS 1481
Perforation Data:
Interval Top:6383 ft.# Of Holes:124
Interval Bottom:8508 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)66
Total Gas Produced (MCF)16810
GOR254696
GOR DeterminationMCFE
Average BOE per Day8.122
Average MCFE per Day47.114

 Federal Financial Assurance  i Y

 Tribal Well  i No