Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12817
Well Classification: GW Status: PR - 6/12/2007
Well Name/No:FEDERAL #RWF 423-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date6/12/2007
FacilityID:286869LocationID:335743
County:GARFIELD #045Location:NESE 8 6S94W 6
Field:RULISON - #75400Elevation:5940 ft.
Basin:PICEANCE BASIN  
Planned Location:1798FSL  514 FELLat/Long: 39.537400 / -107.904530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.537402 / -107.904534Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/12/2007             Measured TD: 9425 ft.    Vertical TD: 8711 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/12/2007
Wellbore PermitDIRECTIONAL
Permit #:20073410 Expiration Date:8/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 2137 FSL  1900 FWL
Bottom Hole Location:Sec: Twp: Footage: 2137 FSL  1900 FWL
Proposed Depth/Form:9439 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/6/2008
Spud Date:6/15/2008Spud Date Is:ACTUAL
Measured TD:9425 ft.Measured PB depth:9410 ft.
True Vertical TD:8711 ft.True Vertical PB depth:8696 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 2143 FSL  1886 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 2143 FSL  1886 FWL
Log Types:CBL, HIGH RES.IND., SPECTRAL DENS.,DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3116 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 0 ft., Bottom: 3116 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9410 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1273, Top: 4650 ft., Bottom: 9410 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2856 ft.NN
MESAVERDE5716 ft.NN
CAMEO8498 ft.NN
ROLLINS9399 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/18/2009                 Interval Top: 7082 ft.    Interval Bottom: 9167 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/19/2008Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2008
Treatment Summary:3500 GALS 7.5% HCL; 727,500# 20/40 SAND; 22,246 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8621 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/18/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CALC_BBLS_OIL 0
CASING_PRESS 661
MCF_GAS 807
TUBING_PRESS 379
Perforation Data:
Interval Top:7082 ft.# Of Holes:117
Interval Bottom:9167 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)46
Total Gas Produced (MCF)12443
GOR270500
GOR DeterminationMCFE
Average BOE per Day6.004
Average MCFE per Day34.825

 Federal Financial Assurance  i Y

 Tribal Well  i No