Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12811
Well Classification: GW Status: PR - 4/1/2020
Well Name/No:FEDERAL #RWF 34-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date4/1/2020
FacilityID:286875LocationID:335743
County:GARFIELD #045Location:NESE 8 6S94W 6
Field:RULISON - #75400Elevation:5940 ft.
Basin:PICEANCE BASIN  
Planned Location:1760FSL  538 FELLat/Long: 39.537298 / -107.904619Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.537302 / -107.904626Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2020             Measured TD: 8932 ft.    Vertical TD: 8686 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20084131 Expiration Date:8/4/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1098 FSL  2054 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 1098 FSL  2054 FEL
Proposed Depth/Form:9014 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:10/29/2008
Spud Date:10/10/2008Spud Date Is:ACTUAL
Measured TD:8932 ft.Measured PB depth:8850 ft.
True Vertical TD:8686 ft.True Vertical PB depth:8604 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 1112 FSL  2067 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 1112 FSL  2067 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2875 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 2875 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8917 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 4640 ft., Bottom: 8917 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2529 ft.NN
MESAVERDE5217 ft.NN
CAMEO7996 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2020                  Interval Top: 6586 ft.    Interval Bottom: 8673 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/10/2009Choke Size:0.172 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2009
Treatment Summary:3058 GALS 7 1/2% HCL; 765800 # 20/40 SAND; 21610 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8298 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1072
CALC_GOR 0
CASING_PRESS 1990
GRAVITY_OIL 55
MCF_GAS 1029
TUBING_PRESS 1765
Perforation Data:
Interval Top:6586 ft.# Of Holes:118
Interval Bottom:8673 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)64
Total Gas Produced (MCF)16719
GOR261234
GOR DeterminationMCFE
Average BOE per Day8.067
Average MCFE per Day46.817

 Federal Financial Assurance  i Y

 Tribal Well  i No