Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12783
Well Classification: GW Status: PR - 1/29/2009
Well Name/No:FEDERAL #GM 441-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date1/29/2009
FacilityID:286838LocationID:334850
County:GARFIELD #045Location:NWNE 4 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5473 ft.
Basin:PICEANCE BASIN  
Planned Location:1007FNL  1500 FELLat/Long: 39.470500 / -108.109490Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.470510 / -108.109502Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/29/2009             Measured TD: 6680 ft.    Vertical TD: 6451 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/29/2009
Wellbore PermitDIRECTIONAL
Permit #:20082274 Expiration Date:5/21/2009
Proposed Top PZ Location:Sec: Twp: Footage: 167 FNL  543 FEL
Bottom Hole Location:Sec:4 Twp: 7S 96W Footage: 167 FNL  543 FEL
Proposed Depth/Form:6702 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:9/30/2008
Spud Date:9/23/2008Spud Date Is:ACTUAL
Measured TD:6680 ft.Measured PB depth:6655 ft.
True Vertical TD:6451 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 173 FNL  458 FEL
Bottom Hole Location:Sec:4 Twp: 7S 96WFootage: 173 FNL  458 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 956 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 956 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6668 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 3285 ft., Bottom: 6667 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1766 ft.NN
MESAVERDE3475 ft.NN
CAMEO6049 ft.NN
ROLLINS6542 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/29/2009                 Interval Top: 4864 ft.    Interval Bottom: 6453 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/27/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/27/2008
Treatment Summary:2570 GALS 7 1/2% HCL; 674748# 30/50 SAND; 16731 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5939 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 719
CASING_PRESS 395
MCF_GAS 719
TUBING_PRESS 286
Perforation Data:
Interval Top:4864 ft.# Of Holes:99
Interval Bottom:6453 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)13355
GOR667750
GOR DeterminationMCFE
Average BOE per Day6.360
Average MCFE per Day36.903

 Federal Financial Assurance  i Y

 Tribal Well  i No