Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12709
Well Classification: GW Status: PR - 12/1/2020
Well Name/No:N. PARACHUTE #EF01D D19A 595
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2020
FacilityID:286635LocationID:335905
County:GARFIELD #045Location:NENW 19 5S95W 6
Field:GRAND VALLEY - #31290Elevation:6028 ft.
Basin:PICEANCE BASIN  
Planned Location:422FNL  1775 FWLLat/Long: 39.605397 / -108.102264Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.605398 / -108.102264Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2020             Measured TD: 10850 ft.    Vertical TD: 9598 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20062939 Expiration Date:9/6/2007
Proposed Top PZ Location:Sec:19 Twp: 5S 95W Footage: 893   528 
Bottom Hole Location:Sec:19 Twp: 5S 95W Footage: 893   528 
Proposed Depth/Form:12207 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15,510, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/8/2007
Spud Date:3/14/2007Spud Date Is:ACTUAL
Measured TD:10850 ft.Measured PB depth:10739 ft.
True Vertical TD:9598 ft.True Vertical PB depth:
Top PZ Location:Sec:19 Twp: 5S 95WFootage: 893 FNL  528 FEL
Bottom Hole Location:Sec:19 Twp: 5S 95WFootage: 893 FNL  528 FEL
Log Types:CBL; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 143 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 143 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2513 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2538 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10838 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1576, Top: 2770 ft., Bottom: 10850 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6867 ft.NN
ROLLINS10621 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 12/1/2020                 Interval Top: 6956 ft.    Interval Bottom: 10529 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/16/2007Choke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/29/2007
Treatment Summary:STAGE 01-10 TREATED W/TOTAL OF 36,150 BBLS OF SLICKWATER, 861,455 LBS 20-40 SAND, 474,926 LBS 30-50 SAND AND 36 BBLS 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:8149 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1170
CASING_PRESS 1221
MCF_GAS 892
TUBING_PRESS 758
Perforation Data:
Interval Top:6956 ft.# Of Holes:300
Interval Bottom:10529 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)81
Total Gas Produced (MCF)15363
GOR189666
GOR DeterminationMCFE
Average BOE per Day7.491
Average MCFE per Day43.459

 Federal Financial Assurance  i 

 Tribal Well  i No