|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/15/2012 Measured TD: 8845 ft. Vertical TD: 8837 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/15/2012 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063303 | Expiration Date: | 8/28/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 192 FSL 149 FWL | | Bottom Hole Location: | Sec:30 Twp: 5S 95W | Footage: 192 FSL 149 FWL | | Proposed Depth/Form: | 8799 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 45 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/29/2006 | | Spud Date: | 12/3/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8845 ft. | Measured PB depth: | 8776 ft. | | True Vertical TD: | 8837 ft. | True Vertical PB depth: | 8768 ft. | | Top PZ Location: | Sec:30 Twp: 5S 95W | Footage: 193 FSL 152 FWL | | Bottom Hole Location: | Sec:30 Twp: 5S 95W | Footage: 187 FSL 132 FWL | | Log Types: | CBL; PLATFORM EXP, GR, ARRAY IND/SP | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2609 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 686, Top: 0 ft., Bottom: 2609 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8803 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 919, Top: 4000 ft., Bottom: 8803 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8803 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 919, Top: 4116 ft., Bottom: 8803 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2993 ft. | 3558 ft. | | | | WASATCH G | 2993 ft. | | N | N | | FORT UNION | 3559 ft. | 5025 ft. | | | | WILLIAMS FORK | 5026 ft. | 8110 ft. | | | | MESAVERDE | 5433 ft. | | N | N | | CAMEO | 8111 ft. | 8766 ft. | | | | ROLLINS | 8766 ft. | 8845 ft. | | |
Formation WFCM Formation Classification: GW Status: PR - 11/15/2012 Interval Top: 5074 ft. Interval Bottom: 6979 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 3/9/2012 | Choke Size: | 32.000 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/25/2012 | | Treatment Summary: | Stages 1R, 2R, 3R, 4R, 5R, 6R treated with a total of: 66,764 bbls of Slickwater. | | Formation Treatment | | Treatment Date: | 6/22/2007 | | Treatment Summary: | 3000 GALS 7 1/2% HCL, 685300# 30/50 SAND, 19397 BBLS SLICKWATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5999 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/24/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 16 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 603 | | CASING_PRESS | 817 | | MCF_GAS | 603 | | TUBING_PRESS | 294 |
| | Perforation Data: | | Interval Top: | 5074 ft. | # Of Holes: | 180 | | Interval Bottom: | 6979 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 5/15/2012 Interval Top: 5074 ft. Interval Bottom: 6979 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 3/12/2012 | Choke Size: | 32.000 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/25/2012 | | Treatment Summary: | Stages 1R, 2R, 3R, 4R, 5R, 6R treated with a total of: 66764 bbls of Slickwater. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5999 ft. | | Tubing Packer Depth: | 0 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/24/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 16 | | CALC_MCF_GAS | 603 | | CASING_PRESS | 817 | | MCF_GAS | 603 | | TUBING_PRESS | 294 |
| | Perforation Data: | | Interval Top: | 5074 ft. | # Of Holes: | 180 | | Interval Bottom: | 6979 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 58 |
| Total Gas Produced (MCF) | 18096 |
| GOR | 312000 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.709 |
| Average MCFE per Day | 50.511 |
| Federal Financial Assurance | i | Y |
|
|