Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12664
Well Classification: GW Status: PR - 5/1/2024
Well Name/No:WILLIAMS #GM 34-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 50783
Facility Status:PRStatus Date5/1/2024
FacilityID:286406LocationID:334743
County:GARFIELD #045Location:SESE 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5365 ft.
Basin:PICEANCE BASIN  
Planned Location:856FSL  1200 FELLat/Long: 39.475640 / -108.070940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475641 / -108.070943Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2024             Measured TD: 6754 ft.    Vertical TD: 6743 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20063141 Expiration Date:8/27/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1072 FSL  1361 FEL
Bottom Hole Location:Sec:35 Twp: 6S 96W Footage: 1072 FSL  1361 FEL
Proposed Depth/Form:6754 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:11/16/2006
Spud Date:11/7/2006Spud Date Is:ACTUAL
Measured TD:6754 ft.Measured PB depth:6720 ft.
True Vertical TD:6743 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 96WFootage: 1086 FSL  1343 FEL
Bottom Hole Location:Sec:35 Twp: 6S 96WFootage: 1086 FSL  1343 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1130 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6747 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 821, Top: 1900 ft., Bottom: 6747 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1729 ft.NN
FORT UNION2077 ft.NN
MESAVERDE3575 ft.NN
CAMEO6133 ft.NN
ROLLINS6613 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2024                  Interval Top: 4793 ft.    Interval Bottom: 6488 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/5/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/4/2007
Treatment Summary:3532 GALS 7 1/2% HCL; 941400 30/50 SAND; 21935 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6112 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/16/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CASING_PRESS 1572
MCF_GAS 1321
TUBING_PRESS 1465
Perforation Data:
Interval Top:4793 ft.# Of Holes:122
Interval Bottom:6488 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)21840
GOR808888
GOR DeterminationMCFE
Average BOE per Day10.396
Average MCFE per Day60.306

 Federal Financial Assurance  i Y

 Tribal Well  i No