Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12653
Well Classification: GW Status: SI - 1/1/2026
Well Name/No:CHEVRON #20-1D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:286361LocationID:335621
County:GARFIELD #045Location:NENW 20 5S96W 6
Field:GRAND VALLEY - #31290Elevation:8339 ft.
Basin:PICEANCE BASIN  
Planned Location:696FNL  1925 FWLLat/Long: 39.605936 / -108.195339Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.606083 / -108.195253Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2026             Measured TD: 10355 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #:20063045 Expiration Date:8/23/2007
Proposed Top PZ Location:Sec: Twp: Footage: 225 FNL  2239 FWL
Bottom Hole Location:Sec:20 Twp: 5S 96W Footage: 225 FNL  2239 FWL
Proposed Depth/Form:10331 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-18 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:1/4/2007
Spud Date:11/21/2006Spud Date Is:ACTUAL
Measured TD:10355 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 5S 96WFootage: 287 FNL  2227 FWL
Bottom Hole Location:Sec:20 Twp: 5S 96WFootage: 287 FNL  2227 FWL
Log Types:CBL/GR/CCL; RST/TEMP/PRESS; MUDLOG
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 109 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.375 in., Size: 9.625 in., Top: 0 ft., Depth: 3209 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 3209 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10330 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1600, Top: 5180 ft., Bottom: 10330 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 8.375 in., Size: 7 in., Top: 2384 ft., Depth: 6549 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 2000, Top: 6000 ft., Bottom: 6549 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK6894 ft.NN
MESAVERDE7052 ft.NN
CAMEO9434 ft.NN
ROLLINS10027 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 1/1/2026                  Interval Top: 6957 ft.    Interval Bottom: 9704 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/17/2007Choke Size:0.250 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/23/2007
Treatment Summary:WELL WAS TREATED IN 8 STAGES USING 35,480 BBLS OF SLICKWATER AND 1,316,102 LBS OF 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:9468 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1060
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 270
CASING_PRESS 450
MCF_GAS 270
Perforation Data:
Interval Top:6957 ft.# Of Holes:180
Interval Bottom:9704 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5758
GOR
GOR DeterminationMCFE
Average BOE per Day2.706
Average MCFE per Day15.706

 Federal Financial Assurance  i 

 Tribal Well  i No