Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12626
Well Classification: GW Status: PR - 6/30/2009
Well Name/No:FEDERAL #PA 544-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62162
Facility Status:PRStatus Date6/30/2009
FacilityID:286236LocationID:335446
County:GARFIELD #045Location:SWSW 28 6S95W 6
Field:PARACHUTE - #67350Elevation:5636 ft.
Basin:PICEANCE BASIN  
Planned Location:666FSL  361 FWLLat/Long: 39.490069 / -108.011285Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.490068 / -108.011289Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/30/2009             Measured TD: 7546 ft.    Vertical TD: 7512 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/30/2009
Wellbore PermitDIRECTIONAL
Permit #:20080783 Expiration Date:3/26/2009
Proposed Top PZ Location:Sec: Twp: Footage: 542 FSL  204 FEL
Bottom Hole Location:Sec:29 Twp: 6S 95W Footage: 542 FSL  204 FEL
Proposed Depth/Form:7568 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/8/2008
Spud Date:10/28/2008Spud Date Is:ACTUAL
Measured TD:7546 ft.Measured PB depth:7490 ft.
True Vertical TD:7512 ft.True Vertical PB depth:7456 ft.
Top PZ Location:Sec:29 Twp: 6S 95WFootage: 552 FSL  201 FEL
Bottom Hole Location:Sec:29 Twp: 6S 95WFootage: 552 FSL  201 FEL
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE
Log Types:CBL, RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2153 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 542, Top: 0 ft., Bottom: 2153 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7527 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 940, Top: 3280 ft., Bottom: 7527 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1909 ft.NN
MESAVERDE4090 ft.NN
CAMEO6780 ft.NN
ROLLINS7444 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/30/2009                 Interval Top: 5315 ft.    Interval Bottom: 7381 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/7/2009Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/5/2009
Treatment Summary:3620 GALS 7 1/2% HCL; 1041600 #20/40 SAND; 27410 BBLS SLICKWATER (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:7060 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1076
CALC_GOR 0
CASING_PRESS 695
MCF_GAS 1053
TUBING_PRESS 434
Perforation Data:
Interval Top:5315 ft.# Of Holes:132
Interval Bottom:7381 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)16905
GOR444868
GOR DeterminationMCFE
Average BOE per Day8.094
Average MCFE per Day46.919

 Federal Financial Assurance  i Y

 Tribal Well  i No