Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12599
Well Classification: GW Status: PR - 12/13/2007
Well Name/No:PA #31-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/13/2007
FacilityID:285999LocationID:334700
County:GARFIELD #045Location:SWSE 32 6S95W 6
Field:PARACHUTE - #67350Elevation:5140 ft.
Basin:PICEANCE BASIN  
Planned Location:804FSL  2076 FELLat/Long: 39.476050 / -108.019680Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.476058 / -108.019689Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/13/2007             Measured TD: 6640 ft.    Vertical TD: 6485 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/13/2007
Wellbore PermitDIRECTIONAL
Permit #:20062742 Expiration Date:8/1/2007
Proposed Top PZ Location:Sec: Twp: Footage: 226 FNL  2268 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95W Footage: 226 FNL  2268 FEL
Proposed Depth/Form:6683 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/5/2007
Spud Date:1/25/2007Spud Date Is:ACTUAL
Measured TD:6640 ft.Measured PB depth:6596 ft.
True Vertical TD:6485 ft.True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 7S 95WFootage: 197 FNL  2485 FEL
Bottom Hole Location:Sec:5 Twp: 7S 95WFootage: 197 FNL  2485 FEL
Log Types:CBL; HRI/SDL/DSN; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1564 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 415, Top: 0 ft., Bottom: 1564 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6627 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 2600 ft., Bottom: 6627 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1294 ft.NN
FORT UNION1656 ft.NN
MESAVERDE3428 ft.NN
CAMEO5897 ft.NN
ROLLINS6567 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/13/2007                Interval Top: 4701 ft.    Interval Bottom: 6498 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/14/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/13/2007
Treatment Summary:3000 GALS 7 1/2% HCL; 734,700# 30/50 SAND; 17,225 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6060 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1352
MCF_GAS 1142
TUBING_PRESS 1261
Perforation Data:
Interval Top:4701 ft.# Of Holes:125
Interval Bottom:6498 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24
Total Gas Produced (MCF)17713
GOR738041
GOR DeterminationMCFE
Average BOE per Day8.438
Average MCFE per Day48.935

 Federal Financial Assurance  i 

 Tribal Well  i No