Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12554
Well Classification: GW Status: PR - 7/19/2006
Well Name/No:KNIGHT #PA 42-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/19/2006
FacilityID:285754LocationID:334569
County:GARFIELD #045Location:NENE 4 7S95W 6
Field:PARACHUTE - #67350Elevation:5117 ft.
Basin:PICEANCE BASIN  
Planned Location:550FNL  838 FELLat/Long: 39.471990 / -107.996600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471983 / -107.996588Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/19/2006             Measured TD: 6833 ft.    Vertical TD: 6651 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/19/2006
Wellbore PermitDIRECTIONAL
Permit #:20062523 Expiration Date:7/18/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1735 FNL  771 FEL
Bottom Hole Location:Sec:4 Twp: 7S 95W Footage: 1735 FNL  771 FEL
Proposed Depth/Form:6830 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-12 , Unit Acreage: 640, Drill Unit: SEC.

Wellbore Completed
Completion Date:12/14/2006
Spud Date:12/4/2006Spud Date Is:ACTUAL
Measured TD:6833 ft.Measured PB depth:6800 ft.
True Vertical TD:6651 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 7S 95WFootage: 1731 FNL  741 FEL
Bottom Hole Location:Sec:4 Twp: 7S 95WFootage: 1731 FNL  741 FEL
Log Types:2-CBLS; HIGH RESOLUTION INDUCTION/SPECTRAL DENSIT/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1426 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 253, Top: 0 ft., Bottom: 1426 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6913 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 2812 ft., Bottom: 6913 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1186 ft.NN
MESAVERDE3377 ft.NN
CAMEO6034 ft.NN
ROLLINS6714 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/18/2007                 Interval Top: 4837 ft.    Interval Bottom: 6629 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/7/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/6/2007
Treatment Summary:3000 GALS 7 1/2% HCL; 630,300# 30/50 SAND; 14,742 BBL SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:6069 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/18/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1484
MCF_GAS 1210
TUBING_PRESS 1410
Perforation Data:
Interval Top:4837 ft.# Of Holes:116
Interval Bottom:6629 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)13414
GOR706000
GOR DeterminationMCFE
Average BOE per Day6.389
Average MCFE per Day37.065

 Federal Financial Assurance  i 

 Tribal Well  i No