Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12543
Well Classification: GW Status: PR - 7/19/2006
Well Name/No:GARFIELD COUNTY #RWF 411-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/19/2006
FacilityID:285773LocationID:335062
County:GARFIELD #045Location:NWNW 21 6S94W 6
Field:RULISON - #75400Elevation:5453 ft.
Basin:PICEANCE BASIN  
Planned Location:501FNL  801 FWLLat/Long: 39.516740 / -107.900050Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.516747 / -107.900051Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/18/2006             Measured TD: 7980 ft.    Vertical TD: 7968 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/18/2006
Wellbore PermitDIRECTIONAL
Permit #:20062536 Expiration Date:7/18/2007
Proposed Top PZ Location:Sec: Twp: Footage: 247 FNL  605 FWL
Bottom Hole Location:Sec:21 Twp: 6S 94W Footage: 247 FNL  605 FWL
Proposed Depth/Form:7977 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/5/2006
Spud Date:10/24/2006Spud Date Is:ACTUAL
Measured TD:7980 ft.Measured PB depth:7904 ft.
True Vertical TD:7968 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 6S 94WFootage: 229 FNL  608 FWL
Bottom Hole Location:Sec:21 Twp: 6S 94WFootage: 229 FNL  608 FWL
Log Types:CBL; HIGH RESOLUTION INDUCTION/SPECTRAL DENSITY/DUAL SPACED NEUTRON; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1128 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7962 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 3322 ft., Bottom: 7962 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1842 ft.NN
MESAVERDE4295 ft.NN
CAMEO7064 ft.NN
ROLLINS7952 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/13/2007                 Interval Top: 5682 ft.    Interval Bottom: 7720 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/24/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/23/2006
Treatment Summary:3104 GALS 7 1/2% HCL; 801,700# 20/40 SAND; 20,309 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7025 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/13/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1157
MCF_GAS 1185
TUBING_PRESS 1104
Perforation Data:
Interval Top:5682 ft.# Of Holes:118
Interval Bottom:7720 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)19743
GOR506230
GOR DeterminationMCFE
Average BOE per Day9.451
Average MCFE per Day54.795

 Federal Financial Assurance  i Y

 Tribal Well  i No