|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2025 Measured TD: 12063 ft. Vertical TD: 12014 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20082332 | Expiration Date: | 5/22/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 656 FSL 1980 FWL | | Bottom Hole Location: | Sec:8 Twp: 7S 91W | Footage: 656 FSL 1980 FWL | | Proposed Depth/Form: | 6837 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MNCS , Formation: MANCOS , Order: 191-60 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/24/2008 | | Spud Date: | 8/16/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 12063 ft. | Measured PB depth: | 12038 ft. | | True Vertical TD: | 12014 ft. | True Vertical PB depth: | 11989 ft. | | Top PZ Location: | Sec:8 Twp: 7S 91W | Footage: 655 FSL 1989 FWL | | Bottom Hole Location: | Sec:8 Twp: 7S 91W | Footage: 655 FSL 1989 FWL | | Log Types: | CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1525 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1525 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12062 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: , Bottom: 12063 ft., Determination Method: | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: 5.5 in., Top: , Depth: 7009 ft., Weight: , Citings Type: COGCC | | Cement: | Sacks: 145, Top: , Bottom: 7009 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 5.5 in., Top: , Depth: 7009 ft., Weight: , Citings Type: COGCC | | Cement: | Sacks: 881, Top: 5950 ft., Bottom: 7009 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 2573 ft. | | N | N | | CAMEO | 5204 ft. | | N | N | | ROLLINS | 6491 ft. | | N | N | | COZZETTE | 7103 ft. | | N | N | | CORCORAN | 7300 ft. | | N | N | | MANCOS | 7578 ft. | | N | N | | NIOBRARA | 11263 ft. | | N | N |
Formation MNCS Formation Classification: GW Status: SI - 4/1/2025 Interval Top: 7630 ft. Interval Bottom: 12023 ft.| Completed Information for Formation MANCOS | | 1st Production Date: | 7/20/2008 | Choke Size: | 0.313 in. | | Formation Name: | MANCOS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/28/2008 | | Treatment Summary: | MNCS - FRAC WITH 85711 BBLS OF 2% KCL & 2356900 LBS 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10367 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/17/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 595 | | BTU_GAS | 964 | | CALC_BBLS_H2O | 595 | | CALC_MCF_GAS | 2299 | | CASING_PRESS | 3050 | | MCF_GAS | 2299 | | TUBING_PRESS | 1975 |
| | Perforation Data: | | Interval Top: | 7630 ft. | # Of Holes: | 764 | | Interval Bottom: | 12023 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/03/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 8 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.024 |
| Federal Financial Assurance | i | Y |
|
|