Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12322
Well Classification: GW Status: PR - 8/1/2021
Well Name/No:N PARACHUTE #MF16C N04 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2021
FacilityID:284960LocationID:335598
County:GARFIELD #045Location:NESW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5864 ft.
Basin:PICEANCE BASIN  
Planned Location:1835FSL  2408 FWLLat/Long: 39.551753 / -108.112231Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.551749 / -108.112232Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2021             Measured TD: 8764 ft.    Vertical TD: 8363 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20061797 Expiration Date:6/4/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1650 FSL  990 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96W Footage: 1650 FSL  990 FEL
Proposed Depth/Form:9397 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/15/2006
Spud Date:7/20/2006Spud Date Is:ACTUAL
Measured TD:8764 ft.Measured PB depth:8618 ft.
True Vertical TD:8363 ft.True Vertical PB depth:8217 ft.
Top PZ Location:Sec:4 Twp: 6S 96WFootage: 1724 FSL  1136 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96WFootage: 1724 FSL  1136 FEL
Log Types:MUDLOG AND CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2533 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2533 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8653 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 1375 ft., Bottom: 8652 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5079 ft.8550 ft.NN
ROLLINS8550 ft.8764 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2021                  Interval Top: 5120 ft.    Interval Bottom: 8461 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/2/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2007
Treatment Summary:STAGES 1-10 TREATED WITH A TOTAL OF: 30,109 BBLS OF CLEAR FRAC SLICKWATER, 1,138,872 20-40 SAND, AND 36 BBLS OF 15% HCL
Tubing Size:2.375 in.Tubing Setting Depth:7439 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CASING_PRESS 310
MCF_GAS 532
TUBING_PRESS 783
Perforation Data:
Interval Top:5120 ft.# Of Holes:279
Interval Bottom:8461 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)63
Total Gas Produced (MCF)12399
GOR196809
GOR DeterminationMCFE
Average BOE per Day6.034
Average MCFE per Day34.992

 Federal Financial Assurance  i 

 Tribal Well  i No