Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12318
Well Classification: GW Status: PR - 5/1/2021
Well Name/No:N PARACHUTE #MF09A N04 696
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:284964LocationID:335598
County:GARFIELD #045Location:NESW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5861 ft.
Basin:PICEANCE BASIN  
Planned Location:1830FSL  2380 FWLLat/Long: 39.551739 / -108.112333Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.551730 / -108.112330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2021             Measured TD: 9430 ft.    Vertical TD: 8460 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20061804 Expiration Date:6/4/2007
Proposed Top PZ Location:Sec:4 Twp: 6S 96W Footage: 2526 FNL  572 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96W Footage: 2526 FNL  572 FEL
Proposed Depth/Form:10036 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15, 51, Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/28/2007
Spud Date:9/28/2006Spud Date Is:ACTUAL
Measured TD:9430 ft.Measured PB depth:9360 ft.
True Vertical TD:8460 ft.True Vertical PB depth:
Top PZ Location:Sec:4 Twp: 6S 96WFootage: 2526 FNL  572 FEL
Bottom Hole Location:Sec:4 Twp: 6S 96WFootage: 2526 FNL  572 FEL
Log Types:MUD, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 120 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2509 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 2520 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9412 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1420, Top: 2140 ft., Bottom: 9430 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK5778 ft.9323 ft.NN
ROLLINS9323 ft.9430 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 5/1/2021                  Interval Top: 5884 ft.    Interval Bottom: 9249 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/25/2007Choke Size:0.375 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/28/2007
Treatment Summary:STAGES 1-10 TREATED WITH A TOTAL OF 41,679 BBLS OF SLICKWATER, 1,568,000.00 LBS 20-40 SAND AND 32 BBLS OF 15% HCL.
Tubing Size:2.375 in.Tubing Setting Depth:7011 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
CASING_PRESS 903
TUBING_PRESS 672
Perforation Data:
Interval Top:5884 ft.# Of Holes:297
Interval Bottom:9249 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)54
Total Gas Produced (MCF)10088
GOR186814
GOR DeterminationMCFE
Average BOE per Day4.912
Average MCFE per Day28.489

 Federal Financial Assurance  i 

 Tribal Well  i No