|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2025 Measured TD: 7325 ft. Vertical TD: 7296 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20061716 | Expiration Date: | 5/17/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 150 FNL 1890 FWL | | Bottom Hole Location: | Sec:8 Twp: 8S 95W | Footage: 150 FNL 1890 FWL | | Proposed Depth/Form: | 7307 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CCRCW , Formation: COZZ-CRCRN-RLNS-CMEO-WMFK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 60 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7307 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 3500 ft., Bottom: 7307 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/7/2006 | | Spud Date: | 5/29/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 7325 ft. | Measured PB depth: | 6840 ft. | | True Vertical TD: | 7296 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:8 Twp: 8S 95W | Footage: 174 FNL 1924 FWL | | Bottom Hole Location: | Sec:8 Twp: 8S 95W | Footage: 174 FNL 1924 FWL | | Log Types: | HRI; SD/DSN; RMTE; 2-CBL/GR/CCL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1527 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1527 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6893 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: 4950 ft., Bottom: 7325 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4910 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 4782 ft., Bottom: 4950 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4770 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 4640 ft., Bottom: 4782 ft., Determination Method: CBL | | Casing: | String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 3575 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 3180 ft., Bottom: 3640 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3921 ft. | | N | N | | CAMEO | 6269 ft. | | N | N | | ROLLINS | 6659 ft. | | N | N | | COZZETTE | 6936 ft. | | N | N | | CORCORAN | 7174 ft. | | N | N | | MANCOS | 7288 ft. | | N | N |
Formation CMEO Formation Classification: GW Status: CM - 1/31/2008 Interval Top: 6348 ft. Interval Bottom: 6634 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 9/21/2006 | Choke Size: | | | Formation Name: | CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/21/2006 | | Treatment Summary: | FRAC' 750 GAL. 7.5% HCL ACID, 1789 BBLS. 2% 1024 SX 30/50 SAND, 103 TONS CO2 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | Perforation Data: | | Interval Top: | 6348 ft. | # Of Holes: | 24 | | Interval Bottom: | 6634 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 7/1/2025 Interval Top: 4892 ft. Interval Bottom: 6634 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/21/2006 | Choke Size: | 0.313 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/7/2006 | | Treatment Summary: | COMMINGLED WILLIAMS FORK AND CAMEO FORMATION |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/19/2006 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 240 | | BBLS_OIL | 2 | | BTU_GAS | 1056 | | CALC_BBLS_H2O | 240 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 600000 | | CALC_MCF_GAS | 1200 | | CASING_PRESS | 1400 | | MCF_GAS | 1200 | | TUBING_PRESS | 1380 |
| | Perforation Data: | | Interval Top: | 4892 ft. | # Of Holes: | 120 | | Interval Bottom: | 6634 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 8/31/2007 Interval Top: 4892 ft. Interval Bottom: 6109 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 9/21/2006 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/21/2006 | | Treatment Summary: | FRAC; 3000 GAL. 7.5% HCL ACID, 10,670 BBLS 2&, 5604 SX 30/50 SAND, 395 TONS CO2 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 4892 ft. | # Of Holes: | 96 | | Interval Bottom: | 6109 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.017 |
| Federal Financial Assurance | i | Y |
|
|