Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12242
Well Classification: GW Status: PR - 10/20/2008
Well Name/No:CLOUGH #RWF 524-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/20/2008
FacilityID:284623LocationID:335068
County:GARFIELD #045Location:SWSW 15 6S94W 6
Field:RULISON - #75400Elevation:5770 ft.
Basin:PICEANCE BASIN  
Planned Location:1060FSL  1122 FWLLat/Long: 39.521034 / -107.880014Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.521034 / -107.880013Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/20/2008             Measured TD: 8615 ft.    Vertical TD: 8511 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/20/2008
Wellbore PermitDIRECTIONAL
Permit #:20080306 Expiration Date:2/28/2009
Proposed Top PZ Location:Sec: Twp: Footage: 508 FSL  1998 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 508 FSL  1998 FWL
Proposed Depth/Form:8678 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:6/3/2008
Spud Date:5/26/2008Spud Date Is:ACTUAL
Measured TD:8615 ft.Measured PB depth:8569 ft.
True Vertical TD:8511 ft.True Vertical PB depth:8465 ft.
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 498 FSL  1995 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 498 FSL  1995 FWL
Log Types:CBL, RMTE (RES. MON. TOOL ELITE)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2342 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 2342 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8603 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 3042 ft., Bottom: 8603 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2099 ft.NN
MESAVERDE4716 ft.NN
CAMEO7530 ft.NN
ROLLINS8450 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/20/2008                Interval Top: 6118 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/15/2008Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2008
Treatment Summary:3523 GALS 7 1/2% HCL; 881700# 20/40 SAND; 25273 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7449 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2008Test Method:FLOWING
Hours Tested:19Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 911
CASING_PRESS 625
MCF_GAS 721
TUBING_PRESS 408
Perforation Data:
Interval Top:6118 ft.# Of Holes:152
Interval Bottom:7990 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)13302
GOR475071
GOR DeterminationMCFE
Average BOE per Day6.362
Average MCFE per Day36.898

 Federal Financial Assurance  i 

 Tribal Well  i No