Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12238
Well Classification: GW Status: PR - 4/2/2007
Well Name/No:CLOUGH #RWF 23-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/2/2007
FacilityID:284627LocationID:335068
County:GARFIELD #045Location:SWSW 15 6S94W 6
Field:RULISON - #75400Elevation:5770 ft.
Basin:PICEANCE BASIN  
Planned Location:1096FSL  1111 FWLLat/Long: 39.521130 / -107.880040Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.521133 / -107.880051Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/2/2007             Measured TD: 8573 ft.    Vertical TD: 8479 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/2/2007
Wellbore PermitDIRECTIONAL
Permit #:20071743 Expiration Date:5/10/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1483 FSL  1971 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94W Footage: 1483 FSL  1971 FWL
Proposed Depth/Form:8692 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-38 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:6/17/2007
Spud Date:5/30/2007Spud Date Is:ACTUAL
Measured TD:8573 ft.Measured PB depth:8333 ft.
True Vertical TD:8479 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 6S 94WFootage: 1467 FSL  1974 FWL
Bottom Hole Location:Sec:15 Twp: 6S 94WFootage: 1467 FSL  1974 FWL
Log Types:CBL; RESEVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1153 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1152 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8525 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1470, Top: 3190 ft., Bottom: 8524 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2086 ft.NN
WILLIAMS FORK4746 ft.NN
CAMEO7582 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/2/2007                  Interval Top: 6180 ft.    Interval Bottom: 8176 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/22/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/21/2007
Treatment Summary:3500 GALS 7 1/2% HCL; 771600# 20/40 SAND; 23373 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7395 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1898
MCF_GAS 1230
TUBING_PRESS 1583
Perforation Data:
Interval Top:6180 ft.# Of Holes:132
Interval Bottom:8176 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)12636
GOR451285
GOR DeterminationMCFE
Average BOE per Day6.048
Average MCFE per Day35.078

 Federal Financial Assurance  i 

 Tribal Well  i No