Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12148
Well Classification: GW Status: PR - 9/1/2025
Well Name/No:CHEVRON #8I-5D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:284332LocationID:335566
County:GARFIELD #045Location:SWSW 4 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5692 ft.
Basin:PICEANCE BASIN  
Planned Location:701FSL  340 FWLLat/Long: 39.548644 / -108.119947Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.548643 / -108.119944Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2025             Measured TD: 7910 ft.    Vertical TD: 7479 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20060854 Expiration Date:4/18/2007
Proposed Top PZ Location:Sec:5 Twp: 6S 96W Footage: 2424 FSL  498 FEL
Bottom Hole Location:Sec:5 Twp: 6S 96W Footage: 2424 FSL  498 FEL
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/10/2007
Spud Date:12/27/2006Spud Date Is:ACTUAL
Measured TD:7910 ft.Measured PB depth:7821 ft.
True Vertical TD:7479 ft.True Vertical PB depth:7390 ft.
Top PZ Location:Sec:5 Twp: 6S 96WFootage: 2424 FSL  498 FEL
Bottom Hole Location:Sec:5 Twp: 6S 96WFootage: 2424 FSL  498 FEL
Log Types:PNDL, CBL, MUD
Casing:String Type: CONDUCTOR, Hole Size: 32 in., Size: 16 in., Top: , Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 8.625 in., Top: , Depth: 2604 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 983, Top: , Bottom: 2604 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7894 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 1634 ft., Bottom: 7894 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2698 ft.NN
FORT UNION3030 ft.NN
WILLIAMS FORK5020 ft.NN
CAMEO7776 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2025                  Interval Top: 5402 ft.    Interval Bottom: 7764 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/26/2007Choke Size:0.250 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/13/2007
Treatment Summary:FRAC'D USING 24,195 BBLS OF SLICKWATER GEL AND 892,508 LBS 30/50 WHITE MESH SAND.
Tubing Size:3.375 in.Tubing Setting Depth:6918 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2007Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1066
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 874
CASING_PRESS 1580
MCF_GAS 874
TUBING_PRESS 1183
Perforation Data:
Interval Top:5402 ft.# Of Holes:135
Interval Bottom:7764 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)5515
GOR787857
GOR DeterminationMCFE
Average BOE per Day2.622
Average MCFE per Day15.225

 Federal Financial Assurance  i 

 Tribal Well  i No