Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12140
Well Classification: GW Status: PR - 4/19/2006
Well Name/No:BATTLEMENT MESA PARTNERS #PA 42-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/19/2006
FacilityID:284344LocationID:334964
County:GARFIELD #045Location:NENE 9 7S95W 6
Field:PARACHUTE - #67350Elevation:5855 ft.
Basin:PICEANCE BASIN  
Planned Location:680FNL  863 FELLat/Long: 39.457508 / -107.996480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.457507 / -107.996484Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/27/2006             Measured TD: 7251 ft.    Vertical TD: 7128 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20060975 Expiration Date:4/18/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1629 FNL  743 FEL
Bottom Hole Location:Sec:9 Twp: 7S 95W Footage: 1629 FNL  743 FEL
Proposed Depth/Form:7242 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-12 , Unit Acreage: 640, Drill Unit: SECTIO

Wellbore Completed
Completion Date:6/4/2006
Spud Date:5/17/2006Spud Date Is:ACTUAL
Measured TD:7251 ft.Measured PB depth:7226 ft.
True Vertical TD:7128 ft.True Vertical PB depth:
Top PZ Location:Sec:9 Twp: 7S 95WFootage: 1614 FNL  737 FEL
Bottom Hole Location:Sec:9 Twp: 7S 95WFootage: 1614 FNL  737 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1134 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7249 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 4230 ft., Bottom: 7249 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1931 ft.NN
FORT UNION2200 ft.NN
MESAVERDE4024 ft.NN
CAMEO6422 ft.NN
ROLLINS7136 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/10/2006                 Interval Top: 5527 ft.    Interval Bottom: 7061 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/23/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:6/22/2006
Treatment Summary:3322 GALS 7-1/2% HCL; 574100# 30/50 SAND; 13538 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:6421 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/10/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1076
MCF_GAS 587
TUBING_PRESS 836
Perforation Data:
Interval Top:5527 ft.# Of Holes:73
Interval Bottom:7061 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)12
Total Gas Produced (MCF)10236
GOR853000
GOR DeterminationMCFE
Average BOE per Day4.874
Average MCFE per Day28.257

 Federal Financial Assurance  i 

 Tribal Well  i No