Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12134
Well Classification: GW Status: PR - 4/18/2006
Well Name/No:FEDERAL #GM 424-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/18/2006
FacilityID:284299LocationID:334595
County:GARFIELD #045Location:SESW 35 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5369 ft.
Basin:PICEANCE BASIN  
Planned Location:544FSL  2045 FWLLat/Long: 39.474847 / -108.077940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.474845 / -108.077951Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/27/2006             Measured TD: 6790 ft.    Vertical TD: 6704 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/27/2006
Wellbore PermitDIRECTIONAL
Permit #:20060976 Expiration Date:4/17/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1189 FSL  2600 FWL
Bottom Hole Location:Sec:35 Twp: 6S 96W Footage: 1189 FSL  2600 FWL
Proposed Depth/Form:6814 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:9/17/2006
Spud Date:9/8/2006Spud Date Is:ACTUAL
Measured TD:6790 ft.Measured PB depth:6756 ft.
True Vertical TD:6704 ft.True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 6S 96WFootage: 1193 FSL  2595 FWL
Bottom Hole Location:Sec:35 Twp: 6S 96WFootage: 1193 FSL  2595 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUDLOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1137 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1136 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6782 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 2400 ft., Bottom: 6782 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1708 ft.NN
FORT UNION2035 ft.NN
MESAVERDE3553 ft.NN
CAMEO6197 ft.NN
ROLLINS6674 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2006                 Interval Top: 4974 ft.    Interval Bottom: 6550 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/21/2006Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2006
Treatment Summary:3006 GALS 7 1/2% HCL; 812000# 30/50 SAND; 18603 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:5978 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 1249
MCF_GAS 953
TUBING_PRESS 1121
Perforation Data:
Interval Top:4974 ft.# Of Holes:101
Interval Bottom:6550 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)15
Total Gas Produced (MCF)11471
GOR764733
GOR DeterminationMCFE
Average BOE per Day5.459
Average MCFE per Day31.685

 Federal Financial Assurance  i Y

 Tribal Well  i No