Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12117
Well Classification: GW Status: PR - 4/2/2007
Well Name/No:FEDERAL #RWF 444-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62160
Facility Status:PRStatus Date4/2/2007
FacilityID:284203LocationID:335637
County:GARFIELD #045Location:SWSW 9 6S94W 6
Field:RULISON - #75400Elevation:5848 ft.
Basin:PICEANCE BASIN  
Planned Location:692FSL  581 FWLLat/Long: 39.534350 / -107.900790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.534357 / -107.900796Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/2/2007             Measured TD: 8790 ft.    Vertical TD: 8708 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/2/2007
Wellbore PermitDIRECTIONAL
Permit #:20071751 Expiration Date:4/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1165 FSL  260 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 1165 FSL  260 FEL
Proposed Depth/Form:8728 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:10/11/2007
Spud Date:8/25/2007Spud Date Is:ACTUAL
Measured TD:8790 ft.Measured PB depth:8599 ft.
True Vertical TD:8708 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 1174 FSL  234 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 1174 FSL  234 FEL
Log Types:CBL, RMTE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1154 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1154 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8770 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1308, Top: 3832 ft., Bottom: 8770 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2396 ft.NN
WILLIAMS FORK4881 ft.NN
CAMEO7776 ft.NN
ROLLINS8640 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/10/2008                 Interval Top: 6458 ft.    Interval Bottom: 8436 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/25/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2007
Treatment Summary:2,982 GALS 7 1/2 % HCL; 560,800 #20/40 SAND; 15,797 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7676 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/10/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1112
CASING_PRESS 486
GRAVITY_OIL 56
MCF_GAS 1004
TUBING_PRESS 251
Perforation Data:
Interval Top:6458 ft.# Of Holes:110
Interval Bottom:8436 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)52
Total Gas Produced (MCF)13112
GOR252153
GOR DeterminationMCFE
Average BOE per Day6.343
Average MCFE per Day36.801

 Federal Financial Assurance  i Y

 Tribal Well  i No