Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12114
Well Classification: GW Status: PR - 4/2/2007
Well Name/No:FEDERAL #RWF 44-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/2/2007
FacilityID:284206LocationID:335637
County:GARFIELD #045Location:SWSW 9 6S94W 6
Field:RULISON - #75400Elevation:5848 ft.
Basin:PICEANCE BASIN  
Planned Location:665FSL  597 FWLLat/Long: 39.534280 / -107.900740Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.534285 / -107.900746Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/2/2007             Measured TD: 8852 ft.    Vertical TD: 8704 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/2/2007
Wellbore PermitDIRECTIONAL
Permit #:20071753 Expiration Date:4/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 651 FSL  683 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 651 FSL  683 FEL
Proposed Depth/Form:8823 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:7/10/2007
Spud Date:6/18/2007Spud Date Is:ACTUAL
Measured TD:8852 ft.Measured PB depth:8521 ft.
True Vertical TD:8704 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 661 FSL  675 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 661 FSL  675 FEL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2688 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 593, Top: 0 ft., Bottom: 2688 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8832 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1276, Top: 3610 ft., Bottom: 8832 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2434 ft.NN
WILLIAMS FORK4991 ft.NN
CAMEO7791 ft.NN
ROLLINS8705 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/13/2008                 Interval Top: 6383 ft.    Interval Bottom: 8450 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/2/2007Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/31/2007
Treatment Summary:3,490 GAL 7 1/2% HCL; 562,300# 20/40 SAND; 16,615 BBL SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7764 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/13/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1103
CASING_PRESS 416
MCF_GAS 714
TUBING_PRESS 264
Perforation Data:
Interval Top:6383 ft.# Of Holes:121
Interval Bottom:8450 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)52
Total Gas Produced (MCF)13337
GOR256480
GOR DeterminationMCFE
Average BOE per Day6.437
Average MCFE per Day37.371

 Federal Financial Assurance  i Y

 Tribal Well  i No