Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12113
Well Classification: GW Status: PR - 4/2/2007
Well Name/No:FEDERAL #RWF 544-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/2/2007
FacilityID:284207LocationID:335637
County:GARFIELD #045Location:SWSW 9 6S94W 6
Field:RULISON - #75400Elevation:5848 ft.
Basin:PICEANCE BASIN  
Planned Location:685FSL  585 FWLLat/Long: 39.534340 / -107.900780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.534340 / -107.900783Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/2/2007             Measured TD: 8873 ft.    Vertical TD: 8709 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/2/2007
Wellbore PermitDIRECTIONAL
Permit #:20071752 Expiration Date:4/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 959 FSL  748 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 959 FSL  748 FEL
Proposed Depth/Form:8854 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:10/5/2007
Spud Date:9/12/2007Spud Date Is:ACTUAL
Measured TD:8873 ft.Measured PB depth:8819 ft.
True Vertical TD:8709 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 974 FSL  738 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 974 FSL  738 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTIO, SPECTRAL DENSITY, DUAL SPACED NEUTRON, MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2729 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 597, Top: 0 ft., Bottom: 2729 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8854 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1297, Top: 2902 ft., Bottom: 8854 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2470 ft.NN
WILLIAMS FORK4994 ft.NN
CAMEO7847 ft.NN
ROLLINS8746 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/19/2008                 Interval Top: 6470 ft.    Interval Bottom: 8667 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/25/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2007
Treatment Summary:2,023 GALS 7 1/2% HCL; 668,700 #20/40 SAND; 18,835 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:8068 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/19/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1080
CASING_PRESS 453
GRAVITY_OIL 56
MCF_GAS 711
TUBING_PRESS 266
Perforation Data:
Interval Top:6470 ft.# Of Holes:127
Interval Bottom:8667 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)47
Total Gas Produced (MCF)12510
GOR266170
GOR DeterminationMCFE
Average BOE per Day6.039
Average MCFE per Day35.038

 Federal Financial Assurance  i Y

 Tribal Well  i No