Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12111
Well Classification: GW Status: PR - 4/2/2007
Well Name/No:FEDERAL #RWF 344-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/2/2007
FacilityID:284209LocationID:335637
County:GARFIELD #045Location:SWSW 9 6S94W 6
Field:RULISON - #75400Elevation:5848 ft.
Basin:PICEANCE BASIN  
Planned Location:659FSL  601 FWLLat/Long: 39.534260 / -107.900730Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.534268 / -107.900732Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/2/2007             Measured TD: 8823 ft.    Vertical TD: 8663 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/2/2007
Wellbore PermitDIRECTIONAL
Permit #:20071755 Expiration Date:4/25/2008
Proposed Top PZ Location:Sec: Twp: Footage: 320 FSL  700 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 320 FSL  700 FEL
Proposed Depth/Form:8842 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:6/17/2007
Spud Date:5/26/2007Spud Date Is:ACTUAL
Measured TD:8823 ft.Measured PB depth:8766 ft.
True Vertical TD:8663 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 326 FSL  705 FEL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 326 FSL  705 FEL
Log Types:CBL; HIGH RESOLUTION INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2687 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 593, Top: 0 ft., Bottom: 2687 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8800 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1285, Top: 3350 ft., Bottom: 8800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2457 ft.NN
WILLIAMS FORK5023 ft.NN
CAMEO7818 ft.NN
ROLLINS8725 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/13/2008                 Interval Top: 6403 ft.    Interval Bottom: 8422 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/2/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/31/2007
Treatment Summary:3010 GAL 7 1/2% HCL; 497,500# 20/40 SAND; 12,937 BBL SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7781 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/13/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1103
CASING_PRESS 423
MCF_GAS 617
TUBING_PRESS 246
Perforation Data:
Interval Top:6403 ft.# Of Holes:104
Interval Bottom:8422 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)35
Total Gas Produced (MCF)8904
GOR254400
GOR DeterminationMCFE
Average BOE per Day4.307
Average MCFE per Day24.949

 Federal Financial Assurance  i Y

 Tribal Well  i No