Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-12108
Well Classification: GW Status: PR - 4/12/2006
Well Name/No:FEDERAL #RWF 511-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/12/2006
FacilityID:284212LocationID:335637
County:GARFIELD #045Location:SWSW 9 6S94W 6
Field:RULISON - #75400Elevation:5848 ft.
Basin:PICEANCE BASIN  
Planned Location:637FSL  624 FWLLat/Long: 39.534208 / -107.900650Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.534207 / -107.900651Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/9/2006             Measured TD: 8762 ft.    Vertical TD: 8487 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/9/2006
Wellbore PermitDIRECTIONAL
Permit #:20060760 Expiration Date:4/11/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1091 FNL  659 FWL
Bottom Hole Location:Sec:16 Twp: 6S 94W Footage: 1091 FNL  659 FWL
Proposed Depth/Form:8894 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:2/17/2007
Spud Date:1/13/2007Spud Date Is:ACTUAL
Measured TD:8762 ft.Measured PB depth:8500 ft.
True Vertical TD:8487 ft.True Vertical PB depth:
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 1076 FNL  634 FWL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 1076 FNL  634 FWL
Log Types:CBL; RESERVOIR MONITOR TOOL ELITE; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 45 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2714 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 599, Top: 0 ft., Bottom: 2713 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8742 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1025, Top: 3918 ft., Bottom: 8741 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2351 ft.NN
MESAVERDE5066 ft.NN
CAMEO7891 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/7/2007                  Interval Top: 6470 ft.    Interval Bottom: 8491 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/22/2007Choke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2007
Treatment Summary:3750 GALS 7 1/2% HCL; 552,500# 20/40 SAND; 15,889 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:8020 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2007Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 1805
MCF_GAS 1190
TUBING_PRESS 1625
Perforation Data:
Interval Top:6470 ft.# Of Holes:121
Interval Bottom:8491 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)19
Total Gas Produced (MCF)15189
GOR799421
GOR DeterminationMCFE
Average BOE per Day7.225
Average MCFE per Day41.929

 Federal Financial Assurance  i Y

 Tribal Well  i No